Setting up the instrument
Basic setup procedures for the instrument are the following:
............................................................................ 71
........................................................................... 72
7.1
Performing a self-alignment
The self-alignment aligns the data from several input channels vertically and hori-
zontally to synchronize the timebases, amplitudes and positions. The self-align-
ment process includes a basic hardware check.
Recommendation on performing the self-alignment:
●
When putting the instrument into operation for the first time
●
After a firmware update
●
Once a week
●
When major temperature changes occur (>
5°)
1. Warm up the instrument before you start the self-alignment. The minimum
warm-up time is indicated in the data sheet.
2. Remove the probes from the input connectors.
3. In the "Menu" > "Settings" menu, select "Maintenance".
4. In the "Alignment" tab, tap "Start Alignment".
The alignment is performed, the process might take several minutes. A mes-
sage box informs you about the running process, wait until this message box
closes.
The overall pass/fail result is shown in the "Overall alignment state" field. The
results of the individual alignment steps for each input channel are indicated in
the "Results" tab. This information is required if problems arise.
Performing a self-alignment