Preparing for use
R&S
®
RTO6
18
Getting Started 1801.6670.02 ─ 04
4
Preparing for use
Here, you can find basic information about setting up the instrument for the first
time or when changing the operating site.
4.1
Lifting and carrying
"Lifting and carrying the instrument"
4.2
Unpacking and checking
1. Unpack the product carefully.
2. Retain the original packing material. Use it when transporting or shipping the
product later.
3. Using the delivery notes, check the equipment for completeness.
4. Check the equipment for damage.
If the delivery is incomplete or equipment is damaged, contact
Rohde
&
Schwarz.
4.3
Choosing the operating site
Specific operating conditions ensure proper operation and avoid damage to the
product and connected devices. For information on environmental conditions
such as ambient temperature and humidity, see the data sheet.
See also
Choosing the operating site