background image

 

_____________________________________________________________________________________________ 

© Rocket Milano s.r.l. -   RE DOPPIA series.  User Manual Ed. 01.2019.  Specifications subject to change without notice.            Page   8

  

 

TECHNICAL DATA 

 

Voltage:

  

 

 

Please refer to the technical data plate on the 

 

 

 

 

machine 

 

Wattage

  

 

 

Please refer to the technical data plate on the 

 

 

 

 

machine  

 

 Temperature 

 

The machine should not be operated with 

 

temperatures under 6°C and over 36 °C. 

 

 

Water   

 

 

The  machine  must  be  operated  with  soft, 

 

 

 

 

 

clean drinking water. If the local water supply 

 

 

 

 

 

has a high mineral  content  use  a  water 

 

 

 

 

 

softener.  A  build-up  of  mineral  deposit  may 

 

 

 

 

 

restrict the flow of water within the hydraulic 

 

 

 

 

 

systems  causing damage to the machine and 

 

 

 

 

 

risking  personal  injury.  Rocket  Espresso 

 

 

 

 

 

recommends installation of an in-line filter. 

 

 

Water pressure from the mains

 

Maximum water inlet pressure is 6 Bar  

 

 

 

 

(0,6 MPa 

 600 KPa). Please install a pressure 

 

 

 

 

reducing valve if water pressure from the 

 

 

 

 

mains is higher.  
 The minimum water pressure is 1.5 Bar 

(0.15MPa-150 KPa) 

 

Hydraulic connections

 

 

Water inlet 3/

8” gas

 

 

 

 

 

 

 

Machine ventilation

 

Please make sure that there is an open area 

of at least 100 mm on each side and behind 
the machine to allow adequate ventilation  

 

Brew boiler capacity 

2 gr: 4 litre 

 3 gr: 6,3 litre 

 4 gr: 8,5 litre 

Service boiler capacity  

2 gr: 9 litre 

 3 gr: 12 litre 

 4 gr: 18 litre 

 

 

 

Dimensions  

 

 

 

Width  

Depth 

Height  

 

2 group 

760 mm 

 29.9 in 

590 mm 

 23.2 in. 

536 mm 

 21.1 in. 

                      3 group 

980 mm- 38.6 in 

590 mm 

 23.2 in. 

536 mm 

 21.1 in. 

                     4 group 

1.200 mm 

 47.2 in 

590 mm 

 23.2 in. 

536 mm 

 21.1 in. 

 

Summary of Contents for RE DOPPIA Series

Page 1: ..._______________________________________________________________ Rocket Milano s r l RE DOPPIA series User Manual Ed 01 2019 Specifications subject to change without notice Page 1 User Instructions Roc...

Page 2: ...eral data 3 Introduction 4 Important safeguards 5 Installation 7 Technical data 8 Installation diagram 9 Description of external components 10 Start up 11 Operation 11 Switching off the machine 15 Pro...

Page 3: ...Espresso RE DOPPIA 2 2 brewing heads Rocket Espresso RE DOPPIA 3 3 brewing heads Rocket Espresso RE DOPPIA 4 4 brewing heads All machines come with User instructions 1 one cup filter handle 1 one cup...

Page 4: ...ed to the machine and or its packaging The manual provides information that is current at the time of publication The information is subject to amendment or alteration without notice Installation shou...

Page 5: ...Use handle or knobs Coffee brewing groups metal pipes spouts steam and hot water valves and wands metal part of filter holders are hot and will cause burns 8 Never hold your hands under the brewing g...

Page 6: ...nce for other than intended use 29 Before any cleaning or maintenance the machine should be disconnected from the electric supply 30 When cleaning the machine never use caustic or abrasive cleaning ch...

Page 7: ...me of installation 4 Installation of any Rocket Espresso Ltd product should only be undertaken by duly authorised properly trained and qualified personnel 5 Protect the user by fitting a circuit break...

Page 8: ...c systems causing damage to the machine and risking personal injury Rocket Espresso recommends installation of an in line filter Water pressure from the mains Maximum water inlet pressure is 6 Bar 0 6...

Page 9: ...eries User Manual Ed 01 2019 Specifications subject to change without notice Page 9 Installation diagram 1 Shut off valve water mains not included to delivery 2 Pressure reducing valve not included to...

Page 10: ...pour any liquid on this tray It will filter inside the equipment and can cause electrical shocks and serious injuries Do not cover the tray with towels etc 5 Touchpad 6 Hot water wand Caution can beco...

Page 11: ...al switch both not included to delivery Turn the on off switch Fig 1 pos 1 from position 0 to position 1 Wait until the boiler pressure gauge fig 1 pos 8 reads the working pressure app 1 0 bar Open th...

Page 12: ...antity of coffee i e 25 cc 1 oz for a typical espresso has been dispensed the machine will stop automatically automatic portion control 9 Remove the filter handle Fig 1 10 from the machine and empty u...

Page 13: ...h an insulated grip with the liquid to be heated up or frothed 2 Position the steam nozzle of the steam wand Fig 1 2 just below the surface of the liquid inside the liquid in the recipient To avoid pe...

Page 14: ...perature is scalded 6 Close steam lever Fig 1 3 rapidly then remove milk pitcher from steam wand 7 Wipe the steam wand Fig 1 2 immediately after using with a non abrasive clean damp towel without touc...

Page 15: ...eam wand Clogged wands and steam valves can be expensive to repair or to replace Burp your steam wand Fig 1 2 immediately after using opening and closing immediately after the steam valve Fig 1 3 Caut...

Page 16: ...ck flush The back flushing cycle stops by itself when terminated For the following operations the machine must be switched off unplugged and completely cooled down Clean showers group gaskets and grou...

Page 17: ...necessary DISASSEMBLING DISMANTLING OF THE MACHINE The machine must be disassembled and dismantled by an authorized technician according to local law and jurisdiction 1 Clean filter holders baskets a...

Page 18: ...OF AUTOMATIC COFFEE AND HOT WATER PORTIONS Touchpad with 2 automatic coffee portion keys Touchpad with 4 automatic coffee portion keys Automtaic hot water portion key Please note that hot water porti...

Page 19: ...stops flashing for the time you dispense coffee and will start flashing again once you stop dispensing When the desired quantity of coffee has been dispensed press this key again Coffee dispensing wi...

Page 20: ...ifications subject to change without notice Page 20 THE TECHNICIAN S MENU The technician s menu must be used exclusively by the authorized and trained technician It is acceded with the machine s main...

Page 21: ...ease note that all settings must be done exclusively using the keypad of machine s left side group exception four group machines where second and third group from left are used Please see above The fi...

Page 22: ...____________________________________________________________________ Rocket Milano s r l RE DOPPIA series User Manual Ed 01 2019 Specifications subject to change without notice Page 22 Electrical diag...

Page 23: ...lve group 1 8 Solenoid valve group 2 9 Solenoid valve group 3 10 Solenoid valve group 4 11 Solenoid valve boiler fill 12 Solenoid valve hot water 13 Solenoid valve hot water tempering valve 14 Touchpa...

Page 24: ...s subject to change without notice Page 24 27 Flowmeter group 3 28 Flowmeter group 4 29 Boiler level probe 30 Boiler safety level probe 31 SSR service boiler 32 Bipolar safety thermostat 33 Service bo...

Page 25: ...____________________________________________________________________ Rocket Milano s r l RE DOPPIA series User Manual Ed 01 2019 Specifications subject to change without notice Page 25 Electrical diag...

Page 26: ...itch 4 Control lamp 5 Control board 6 Pump 7 Solenoid valve group 1 8 Solenoid valve group 2 9 Solenoid valve group 3 11 Solenoid valve boiler fill 12 Soelnoid valve hot water 13 Hot water tempering s...

Page 27: ...__________ Rocket Milano s r l RE DOPPIA series User Manual Ed 01 2019 Specifications subject to change without notice Page 27 33 Servie boiler heating element 34 DAVS thermostat 35 DAVS solenoid valv...

Page 28: ..._______________________________________________________________________________ Rocket Milano s r l RE DOPPIA series User Manual Ed 01 2019 Specifications subject to change without notice Page 28 HYDR...

Page 29: ...Manual boiler fill 4 Non return valve 5 Solenoid valve service boiler fill 6 Solenoid valve hot water tempering 7 Flowmeter 8 Service boiler 9 Vacuum breaker valve 10 Boiler safety valve 11 Solenoid v...

Page 30: ...confirm that the Rocket Espresso RE DOPPIA series of espresso machines have been manufactured according to the following standards EMC 2004 108 EC with application of EN 55014 1 2006 A1 2009 A2 2011...

Reviews: