Pg 28
Pg 29
MACHINE OPERATION – ALL MODELS
1. Install the portafilter by inserting it into the group head and
rotate the portafilter handle from left to right. The portafilter is
inserted properly once it is firmly inside the group head and the
portafilter handle is sitting at 90 degrees from the face of the
machine (Fig G).
2. You can now lift the brew lever (see Fig I on following page) to
start the water flowing though the portafilter.
3. It is important to leave the portafilter installed in the group
head when not in use. The portafilter must remain heated for a
successful brew process. It will also prevent the head seal inside
the group head from drying out prematurely.
4. Single (with one spout) and double (with two spouts) portafilter
handles come ready assembled with single and double baskets
fitted.
G
5. You are now ready to start brewing coffee by removing the
portafilter and placing ground coffee inside the filter basket.
Press down on the coffee with the supplied tamper and install
the portafilter in the group head. Lift the group lever upwards to
release heated water and start the brewing process.
6. To stop the brewing process it is important that the brew lever
is positioned down completely to where the water stops flowing
AND where the pump’s noise can no longer be heard (Fig H).
Fig H. Brew lever
completely down,
water not flowing
and pump off.
Fig I. Pre infusion
position. Pump
not activated but
minimal water
through the group.
Fig J. Brew lever on
and heated water
flowing.
H
I
J
7.
R 60V
– the green light on the pump pressure manometer will
be on when the extraction starts. Once the profile has finished
the light will flash to indicate the program has been completed.
The display unit will indicate shot time throughout the extraction
process.