27
TECHNICAL INFORMATION
ENG
3.2. DESCRIPTION OF THE OPERATION CYCLE
Phase 1
The pallet is loaded on the rotary table against the
bracket on the plate and the operator ties the film ends
in the striker bracket slot.
Caution - warning
Risk of crushing upper limbs.
Do not insert the film in the gripper by hand.
Phase 2
Once the cycle has started, the rotary table starts to
turn, while the spool carriage unwinds the film for the
entire height, according to pre-set parameters.
Phase 3
Once the wrapping phase has ended, the machine
stops and film hot cutting and welding are automatically
performed (CW version).
Phase 4
The operator unloads the pallet.
The cycle is complete and the machine is ready to start
a new cycle.
Summary of Contents for Masterplat FREEZER
Page 2: ...ENG 2 Page left blank intentionally ...
Page 22: ...ENG SAFETY INFORMATION 22 Masterplat PLUS Masterplat PLUS TP3 Masterplat PLUS LP ...
Page 31: ...31 TECHNICAL INFORMATION ENG Masterplat PLUS Masterplat PLUS TP3 Masterplat PLUS LP ...
Page 91: ...91 INFORMATION ABOUT THE USE ENG R Manual cycle See Manual Cycle ECO cycle See Eco Cycle ...