•
Cover battery terminals with rubber or plastic caps to prevent
accidental contact between battery posts and metal objects.
•
Clean outside battery case, terminals, and battery clamps with a
baking soda and water solution. Do not allow solution to enter
battery cells.
•
Clean battery posts and clamps with fine grit emery cloth. Use a
light sanding motion when cleaning.
•
Apply a light coat of petroleum jelly to cover end of
battery cables.
•
Recharge battery monthly or trickle charge continuously while
battery is stored.
RECOMMISSIONING
NOTE: For detailed information on recommissioning your
boat’s systems and equipment, refer to the owner’s manual for
each system or component.
1. Inspect, visually and by smelling, the fuel system and all associ-
ated components for proper connections, wear, leaks, or other
damage and needed repair.
Important: Inspection of the fuel system at recommissioning is
very important. We cannot overemphasize our concern for your
safety.
2. Clean battery terminal posts with wire brush or steel wool
before reinstallation.
3. Check charge on battery. Recharge or replace if necessary.
4. Inspect all battery wiring. Repair or replace if necessary.
5. Attach battery cables, and tighten cable clamps.
6. Apply petroleum jelly or marine grade grease on battery posts
and clamps to eliminate air pockets and possible acid buildups.
7. Reinstall hull drain plug after coating threads with petroleum
jelly.
8. Clean bilge area.
9. Inspect all wiring for fraying, wear, loose connections, or other
damage. Repair or replace if necessary.
10. Test operation of navigation lights and other lighting onboard.
Inspect all switches, controls, and other related equipment for
proper operation. Repair or replace as necessary.
11. Inspect all life jackets, anchor lines, and other safety equipment
for proper operation and physical condition. Repair or replace if
necessary.
9-3
Summary of Contents for 2012 220
Page 18: ...1 11...
Page 23: ...1 16...
Page 75: ...4 13...
Page 112: ...11 1 WIRING SCHEMATICS 11 Robalo 220...
Page 113: ...11 2 Robalo 220...
Page 114: ...11 3 Robalo 225...
Page 115: ...11 4 Robalo 225...
Page 116: ...11 5 Robalo 227...
Page 117: ...11 6 Robalo 227...
Page 118: ...11 7 Robalo 240...
Page 119: ...11 8 Robalo 240...
Page 120: ...11 9 Robalo 245...
Page 121: ...11 10 Robalo 245...
Page 122: ...11 11 Robalo 247...
Page 123: ...11 12 Robalo 247...
Page 124: ...11 13 Robalo 260...
Page 125: ...11 14 Robalo 260...
Page 126: ...11 15 Robalo 265...
Page 127: ...11 16 Robalo 265...
Page 128: ...11 17 Robalo 300...
Page 129: ...11 18 Robalo 300...
Page 130: ...11 19 Robalo 305...
Page 131: ...11 20 Robalo 305...
Page 132: ...WIRING SCHEMATICS 12 12 1 Signature 370...
Page 133: ...12 2 Signature 370...
Page 134: ...12 3 Signature 350...
Page 135: ...12 4 Signature 350...
Page 136: ...12 5 Signature 330...
Page 137: ...12 6 Signature 330...
Page 138: ...12 7 Signature 310...
Page 139: ...12 8 Signature 310...
Page 140: ...12 9 Signature 290...
Page 141: ...12 10 Signature 290...
Page 142: ...12 11 Signature 270...
Page 143: ...12 12 Signature 270...