Three Selector Switches with Two Batteries and
Single Engine
Each of the three battery switches have two positions:
All Switches Off
Power supplied to automatic bilge pump, CO detector (if so
equipped), and stereo memory.
STBD Switch ON
Use only STBD (Main Engine) battery.
PORT Switch ON
Use only PORT (House) battery.
STBD, PORT, and PARALLEL Switches ON
Use STBD (Main Engine) and PORT (House) batteries in
combination.
Recommended settings are as follows:
1. All Switches Off
When boat is not in use or power is not required, turn all
switches to OFF. The only power supplied at this setting is
the automatic bilge pumps, carbon monoxide detector (if
equipped), and stereo memory.
2. STBD Switch ON
To start the engine, place switch in ON position. With this
setting, power will now be supplied to your boat from the
STBD (Main Engine) battery. This will allow the engine alter-
nator to charge on the main battery.
3. PORT Switch ON
For cabin or accessory power, place the switch in the ON
position. Power will now be supplied to your boat from the
House battery.
Note: Robalo does not recommend leaving all three switches
on when the engine is off. This will drain both batteries and
you will not have a starting battery.
4. STBD, PORT, and PARALLEL Switches ON
If both batteries are low, you still have the option of starting
the engine by combining the output from both batteries. This
position is also used to charge both the main and house bat-
teries if the boat is not equipped with a battery isolator.
Note: When recharging a low battery, be sure to run the engine
for a sufficient amount of time to fully recharge the battery.
Note: Robalo does not recommend any other settings than
mentioned because of possible damage to batteries or engine
alternator.
3-5
Figure 3.3 Three Selector Switches with Two Batteries
and Single Engine
Summary of Contents for 2012 220
Page 18: ...1 11...
Page 23: ...1 16...
Page 75: ...4 13...
Page 112: ...11 1 WIRING SCHEMATICS 11 Robalo 220...
Page 113: ...11 2 Robalo 220...
Page 114: ...11 3 Robalo 225...
Page 115: ...11 4 Robalo 225...
Page 116: ...11 5 Robalo 227...
Page 117: ...11 6 Robalo 227...
Page 118: ...11 7 Robalo 240...
Page 119: ...11 8 Robalo 240...
Page 120: ...11 9 Robalo 245...
Page 121: ...11 10 Robalo 245...
Page 122: ...11 11 Robalo 247...
Page 123: ...11 12 Robalo 247...
Page 124: ...11 13 Robalo 260...
Page 125: ...11 14 Robalo 260...
Page 126: ...11 15 Robalo 265...
Page 127: ...11 16 Robalo 265...
Page 128: ...11 17 Robalo 300...
Page 129: ...11 18 Robalo 300...
Page 130: ...11 19 Robalo 305...
Page 131: ...11 20 Robalo 305...
Page 132: ...WIRING SCHEMATICS 12 12 1 Signature 370...
Page 133: ...12 2 Signature 370...
Page 134: ...12 3 Signature 350...
Page 135: ...12 4 Signature 350...
Page 136: ...12 5 Signature 330...
Page 137: ...12 6 Signature 330...
Page 138: ...12 7 Signature 310...
Page 139: ...12 8 Signature 310...
Page 140: ...12 9 Signature 290...
Page 141: ...12 10 Signature 290...
Page 142: ...12 11 Signature 270...
Page 143: ...12 12 Signature 270...