1 Introduction
Manual TME400-VMF · EN07 · December, 7
th
2020
10
- Non-destructive testing was also carried out: X-ray and ultrasonic inspection of
the meter housing for defective points in material, surface crack testing with mag-
netic powder and a color penetration process
- Strength tests for components were conducted at 1.5 times the nominal pressure
for the pressure testing; the leak testing for the assembly was conducted at 1.1.
times the nominal pressure. Certificates were issued for successfully passed tests
- The maximum operating pressure and the permissible temperature range are
specified on the type plate of the device. Operation of the device is only permitted
within these specified ranges.
- A maximal temperature difference of ΔT ≤ 100°K between the inside and outside
of the TME400 must be respected.
- Additional external forces and torques were not taken into account in the pressure
dimensioning.
- In the event that the pressure equipment is to be marketed and put into operation
as an assembly within the meaning of the Pressure Equipment-Directive, an ex-
amination of the assembly must be provided at the latest during the final and
pressure tests.
Otherwise, the commissioning inspector must explicitly point out that a test of the
equipment location with safety function still has to be performed at the installation
site.
Summary of Contents for TME400-VM
Page 1: ...Operating Manual Turbine Meter TME400 VM VMF Stand 07 12 2020 Version 07 Firmware 1 06...
Page 47: ...2 Installation Manual TME400 VMF EN07 December 7th 2020 41 Ex version...
Page 48: ...2 Installation Manual TME400 VMF EN07 December 7th 2020 42 Ex version with current module...
Page 49: ...2 Installation Manual TME400 VMF EN07 December 7th 2020 43 NON Ex version...
Page 112: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 106...
Page 113: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 107...
Page 114: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 108...
Page 115: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 109...
Page 116: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 110...
Page 117: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 111...
Page 118: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 112...
Page 119: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 113...
Page 120: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 114...
Page 121: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 115...
Page 122: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 116...
Page 123: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 117...
Page 124: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 118...
Page 125: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 119...
Page 126: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 120...
Page 127: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 121...
Page 128: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 122...
Page 129: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 123...
Page 130: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 124...
Page 131: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 125...
Page 132: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 126...
Page 133: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 127...
Page 134: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 128...
Page 135: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 129...
Page 136: ...APPENDIX Manual TME400 VMF EN07 December 7th 2020 130...