![RJX Hobby X-50EP Instruction Manual Download Page 25](http://html1.mh-extra.com/html/rjx-hobby/x-50ep/x-50ep_instruction-manual_1466546025.webp)
Rh2
NOTE:
On the seesaw is the the middle hole (S2) selected.
NOTE:
On the pitcharm is the the middle hole (Bh2) selected.
NOTE:
On the mixer arm are the holes Mb2 and Mh2 selected.
NOTE:
On the washout arm the outer hole is selected.
STEP 4-15 ROTOR HEAD SETUP
NOTE:
In this STEP will be explained one setup of the rotor head what is good point for 3D maneuvers. There are many other settings possible.
Linkage rod sizes from the rotor head are changing depending on this settings.
The size of the linkage rod is meassured from center to center of the hole (see STEP 4-11) .
90º
IMPORTANT:
The linkage rod coming from the swash
MUST
be 90º to the mixer arm. If not
there will be different angles from positive
pitch to negative.
Link A 32mm
Link B 46mm
Link C 95mm
IMPORTANT: SECURE ALL JOINT BALLS AND SCREWS WITH THREADLOCK
IMPORTANT:
Ensure that all is leveled (red lines)
and on the main blades you have
0º pitch. This means all controls are
linear.
USE THREADLOCK