background image

T

T

a

a

b

b

l

l

e

e

 

 

o

o

f

f

 

 

C

C

o

o

n

n

t

t

e

e

n

n

t

t

s

s

 

 

 
 

SAFETY

 

NOTES

 

 

IMPORTANT 

 

 

 

 

 

 

                                              

PARTS

 

LIST 

 

 

 

 

 

 

 

 

 

        

 

          

 

P

ART 

N

O

.

 AND 

D

ESCRIPTION

 

 

 

 

 

 

 

  

 

       

 

          

INSTALLATION 

 

 

 

 

 

 

  

 

 

         

 

          

 

S

PECIFICATIONS

 

 

 

 

 

 

 

 

 

       

        3 

  G

ENERAL 

R

EQUIREMENTS

 

 

 

 

 

                

 

    

        3 

  P

LACEMENT 

 

M

INIMUM 

C

LEARANCES

 

 

 

 

 

              

        

        3 

  R

EDUCED 

C

LEARANCES

  

 

 

 

                

 

 

        

        4 

  A

DD

-O

I

NSTALLATION

  

 

 

 

                

 

 

        

        5 

  C

HIMNEY

 

 

 

 

 

               

 

 

                    

        6 

  U

NIT 

A

SSEMBLY

 

 

 

 

                

 

 

                    

        7 

   

Wiring Diagram – Auto Draft

  

 

 

                

 

 

        

        8 

   

Wiring Diagram – Forced Draft

 

 

 

                

 

 

       

        9 

   

Wiring Diagram – Manual Draft

 

 

 

 

                

 

      

      10

  

  Filter 

Box 

Assembly 

Schematic

 

 

 

 

                

 

     

      11 

  S

TOVEPIPE 

I

NSTALLATION

 

 

 

 

               

 

                  

      12 

  B

AROMETRIC 

D

RAFT 

I

NSTALLATION

 

 

                

 

 

                   

      12 

  A

IR 

D

UCT 

I

NSTALLATION

 

 

 

 

                

 

                  

      12 

OPERATION   

 

 

 

 

 

  

 

 

                          

 

       

13 

  G

ENERAL 

I

NSTRUCTIONS

 

 

 

 

                

 

 

       

      13

 

  B

URNING 

W

OOD

 

                    

 

 

                

 

 

       

      14 

  S

TARTING A 

W

OOD 

F

IRE

 

 

 

 

                

 

 

       

      14 

  B

URNING 

C

OAL

 

 

 

 

                

 

 

 

       

      14

 

  S

TARTING A 

C

OAL 

F

IRE

  

 

 

                

 

    

                     

      15 

   

Recharging

   

 

 

                

 

                   

 

       

      15 

   

Bituminous Recharging

 

 

 

 

 

                                  

       

      15 

   

Banking

 

 

 

 

 

                

                               

       

      15 

MAINTENANCE 

 

 

 

 

 

 

  

 

 

        

 

       

16 

  C

REOSOTE 

 

F

ORMATION AND 

N

EED FOR 

R

EMOVAL

  

 

 

                 

       

      16 

  A

SH 

R

EMOVAL

  

 

 

 

                

 

       

 

       

      16 

TROUBLESHOOTING

 

GUIDE   

 

 

 

 

 

  

 

        

 

       

17 

  F

REQUENTLY ASKED QUESTIONS

   

 

 

                

 

 

      

      18 

SIX

 

YEAR

 

PRORATED

 

WARRANTY 

 

 

 

 

 

 

        

 

       

20 

 

 

Summary of Contents for ENERGY KING 360EK

Page 1: ...Wood or Coal Furnaces Models 360EK and 480EK Installation Operation Maintenance Manual RJM Manufacturing Inc PO Box 27 1875 Olson Drive Chippewa Falls WI 54729 715 720 1794 Fax 715 720 1797...

Page 2: ...he installation must be performed by a qualified installer With proper installation and maintenance your Furnace will give you years of trouble free service Energy King s Furnace is designed to burn A...

Page 3: ...ng Diagram Forced Draft 9 Wiring Diagram Manual Draft 10 Filter Box Assembly Schematic 11 STOVEPIPE INSTALLATION 12 BAROMETRIC DRAFT INSTALLATION 12 AIR DUCT INSTALLATION 12 OPERATION 13 GENERAL INSTR...

Page 4: ...ill cause safety and operation problems 8 Do not connect your solid fuel appliance to a chimney flue already venting another appliance 9 Do not let an accumulation of either soot or creosote build up...

Page 5: ...022 98 Cast Iron Hearth End Plates 2 EK007 98 Ash Pan removable EK023 98 Shroud Top EK008 98 Self Tapping Bolts 3 EK024 98 Shroud Left Side EK009 98 x Bolts 8 EK025 98 Shroud Right Side EK010 98 Nuts...

Page 6: ...ant step in positioning your wood coal furnace is the distance from your new or existing chimney The unit should be installed as close to the chimney as possible with a minimum of elbows no more than...

Page 7: ...is added A common mistake is to assume that sheet metal masonry or asbestos board placed directly against a wall protects it Materials installed in this manner give very little protection These materi...

Page 8: ...it and the supplemental unit must be compatible If all these conditions are met then the combined static pressure may not exceed that established by the existing furnace Once it has been determined th...

Page 9: ...mn All chimney connections must meet the approval of the local building inspector and fire marshall and conform to all local state and national codes It is also necessary to clean your chimney of creo...

Page 10: ...nters past any stops on the dial even though the dial may be graduated beyond the stops Limit Move the right hand pointer so that its straight edge indicates the temperature at which the contacts shou...

Page 11: ...Wiring Diagram Auto Draft 8...

Page 12: ...9 9...

Page 13: ...Wiring Diagram Manual Draft 10...

Page 14: ...Filter Box Assembly Schematic CAUTION THE FILTER MUST BE REMOVED IF THE FAN IS INOPERABLE FOR ANY REASON THIS WILL PREVENT OVERHEATING OF THE MOTOR THE AIR FILTER MUST BE NON COMBUSTIBLE 11...

Page 15: ...n Dampers in Stovepipes Put a manual damper at a safe convenient place between the chimney and your Energy King furnace In case of a chimney fire it can quickly be closed reducing draft to the chimney...

Page 16: ...weather Your automobile engine works effectively at 55 mph but can be damaged or destroyed at constant speeds of 90 mph Your furnace can be damaged if it is constantly fired at extremely high tempera...

Page 17: ...couple of handfuls of dry thick kindling wood then several small pieces of firewood Be sure the bypass damper is open 3 It will take 5 to 10 minutes for the fire to establish itself Once you have som...

Page 18: ...build up the coal bed 5 Allow your Energy King to operate with drafts on for approximately 15 minutes or until fresh coal ignites When the coal is properly ignited adjust the thermostat accordingly 6...

Page 19: ...ntly creosote residue accumulates on the flue lining When ignited this creosote makes an extremely hot hot fire The chimney connector and chimney should be inspected at least twice monthly during the...

Page 20: ...eaks Door gaskets glass gaskets ash drawer or door gaskets where applicable Unit does not give off enough heat Is the unit installed correctly 1 Check to see if the unit has an adequate cold air retur...

Page 21: ...n cause creosote buildup in smoke pipe and chimney Coal fire goes out or does not hold overnight Check for the following conditions 1 Poor draft 2 Incorrect damper settings 3 Improper firing methods f...

Page 22: ...ter preheating the chimney If hardwoods are unavailable you can control your fire s burn rate by using larger pieces of wood Q Is it important to season wood before burning it R The seasoning or dryin...

Page 23: ...hase All transportation charges on warranty appliances and appliance parts submitted for repair or replacement under this warranty shall be paid for the by purchaser field analysis of condition remova...

Reviews: