background image

WWW.RSIWW.COM

33 of 40

8.4f

Hold two profiles together in place at ridge using one 

B-4 connector. Insert two T-bolt assemblies, line up 

center hole with long hex bolt in roof ridge. Secure 

T-bolt assemblies 

as shown.Place 

washer on long 

bolt and secure 

with S-2C cap. 

F-1

F-1

R-1

B-4

From inside, hold profile in place with 

one B-4 connector. Secure with two 

T-bolt assemblies as shown.

8.4e

F-1

B-4

F-1

NOTE: VIEWS FROM INSIDE.

8.4D

NOTE: VIEW FROM OUTSIDE.

NOTE: Use dish soap with water 

on edges of panels to help slide 

F-1 profile into place.

From the inside, have one person lift the bottom  

corners of the two panels where they meet.  

From the outside have the other person hold  

and position F-1 profile so both  

panels fit in channels on sides  

of F-1 profile. Slide the F-1  

profile up towards the roof ridge.  

As the profile moves up, have the  

person on the inside guide it into place.  

F-1

B-4

S-5B

1

S-2C

4

S-2D

1

2

Connector

QTY

Connector

QTY

S-7

4

F-1

W-1

W-1

F-1

W-1

W-1

F-1

W-1

W-1

F-1

W-1

W-1

8.7A 

Remove plastic film from both sides of 

one W-2 panel. It will be installed opposite 

the W-1 panel installed in 8.5C. From 

outside position panel with extended 

ledge profile at outside top. Install 

panel at slight angle sliding all the 

way into F-1 profile. Fit other end 

into opposite F-1 profile. When

necessary, loosen B-4 connector 

holding F-1 profiles at sides to 

move each profile away from 

opening to create space to 

slide W-2 panel into channels. 

NOTE: Return all parts to previous 

position when finished.

NOTE: VIEWS FROM OUTSIDE.

W-2

1

Panel

QTY

24” x  32

 

¼”

F-1

F-1

F-7

W-1

 W-2

Summary of Contents for Monticello Mont-8-BK

Page 1: ...Y 65 Fleetwood Drive Rockaway NJ 07866 Customer Service 877 373 3078 Email customerservice rsiww com After Hours Helpline 443 574 4764 8 x 8 Greenhouse Assembly Instructions Monticello Made in the USA...

Page 2: ...osed In cooler snow prone climates Cut some 2 x 4 s and put them against the roof ridge and the floor to help add support from heavy snow and ice This is just a precaution but could save a lot of aggr...

Page 3: ...so applies to any implied warranties that may exist under applicable law Some jurisdictions do not allow limitations on how long an implied warranty lasts so the above limitation may not apply to the...

Page 4: ...t in one staging area The List of Parts has the corresponding step number referenced to each part so you can easily prepare for each step We recommend placing all parts in one staging area Lay out par...

Page 5: ...in a cool dark place such as a garage until you are ready to use them Make sure the greenhouse complies with local building codes Heat the greenhouse during winter months to avoid accumulation of sno...

Page 6: ...red for maximum strength The finished dimensions will be 101 by 1014 Materials Eight 10 pressure treated 2x4 lumber cut to 97 Fifty 8 3 wood screws Make sure each corner is square and then secure one...

Page 7: ...f in one session Do not leave the roof unattended until it is completely assembled Place all like parts together in a staging area Prepare for each step according to instructions in this manual If any...

Page 8: ...3 2 Step 10 E 4 1 Step 10 B 2 5 Step 3 5 B 3 30 Steps 2 3 4 5 10 B 4 9 Step 8 B 5 9 Steps 1 2 4 7 B 7 6 Steps 5 6 7 B 8 4 Step 1 B 10 2 Step 7 B 1 6 Step 6 Door Profiles QTY QTY Profile 24 x 57 W 1 21...

Page 9: ...Brace Trim Plates Connectors Vent Opener QTY QTY QTY QTY QTY QTY QTY QTY T 3 T 4 G 3 A 1 A 2 B 9 T 2 S 10 1 1 4 4 4 1 1 1 Steps 2 3 4 Step 8 Step 8 Step 11 Step 11 Step 8 Steps1 2 3 4 5 6 7 8 9 10 Ste...

Page 10: ...curing in place with a screwdriver Loosen T bolt means turning the T bolt so it is parallel in the bolt track and moves easily Try installing a few T bolts to determine how tightly you will need to tu...

Page 11: ...number of T bolts in the correct bolt track in each profile The profiles have different amounts of T bolts on the inside and outside bolt tracks 1 2 NOTE Instructions identify twenty T bolts necessary...

Page 12: ...corner Equal measurements ensure the base is square Use a spirit level to make sure the base is level 1 4A Locate predrilled holes in base profiles Use six S 4 screws one at each corner and one in th...

Page 13: ...t facing outside The panels will help hold the profiles up during assembly 2 1B Continue working from inside Remove plastic film from both sides of one W 1 panel Fit panel into channel in base and cor...

Page 14: ...iles Hand tighten end T bolts to hold in place 2 4b G 1 G 1 G 1 G 1 G 2 G 2 Place one T bolt on the inside bolt track of the gutter at each end Hand tighten both T bolts to hold in place 2 5b NOTE VIE...

Page 15: ...rs on the outside of the greenhouse The B 3 connector uses the T bolt in the center hole of B 5 connectors at seams Loosen and slide T bolts to line up with connectors making sure the seams line up an...

Page 16: ...56 72 QTY Connector B 3 S 2C S 7 2 4 2 Panels QTY W 1 2 24 x 57 3 1a Working from inside remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing...

Page 17: ...ofile against spacer Repeat step 3 1C to secure WWW RSIWW COM 15 of 40 QTY Profile F 8 1 72 QTY Connector B 3 S 2C S 7 1 2 1 Panels QTY W 1 1 24 x 57 NOTE VIEW FROM INSIDE NOTE VIEW FROM outSIDE 3 2 R...

Page 18: ...dge of F 1 and F 7 vertical profiles Profiles will fit snugly 3 3A Working from inside right corner place F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F...

Page 19: ...ontract depending on the temperature To ensure proper placement use the 23 1 8 inch spacer included with the tools Continue working from inside back left corner Remove plastic film from both sides of...

Page 20: ...king from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile at each end and the two longer G 2 gutter profiles in the...

Page 21: ...ter hole of B 5 connectors at seams Loosen and slide T bolts to line up with connectors making sure the seams line up and the gutters remain straight Beginning at the seams arrange T bolts so middle b...

Page 22: ...exactly as shown Use Phillips screwdriver to tighten S 7 bolts to hold D 8 hinges in place Turn profiles over Slide six T bolts into bolt track of both profiles and position as shown Fit B 2 connector...

Page 23: ...rner profile Position right F 8 profile so single T bolt is next to base on inside and the cut edge angled down toward the nearest corner when installed B 2 connector is pointing towards door opening...

Page 24: ...next to base on inside and the cut edge angled down toward the nearest corner when installed B 2 connector is pointing towards door opening Fit panel into channel in F 8 profile and slide F 8 profile...

Page 25: ...embly into the top slot of the B 2 place the B 2 in position and adjust T bolts to fit B 2 connector Secure with two additional S 2C caps Prepare D 7 latch Fit S 8 bolts in holes in D 7 latch Line up...

Page 26: ...ide Position door frame so barrel latch is on outside Loosen set screws on ends of F 5 profile and adjust position to fit holes in B 2 connector Secure with two bolts Ensure height to base is 68 Remov...

Page 27: ...end touches top of G 1 gutter Position both F 7 profiles Use C 1 connector with three T bolt assemblies to secure each outside corner Make sure all profiles line up flush against each other Repeat on...

Page 28: ...to B 1 connector with one T bolt assembly 6 1A Working from inside place F 2 profile on F 1 profile Make sure profiles are straight 6 1b From inside add connector B 7 to each corner Secure each with t...

Page 29: ...its against cut angle of F 8 profile One end touches top of gutter and top end touches edge of F 2 center profile Position both F 7 profiles Use C 1 connector with three T bolt assemblies to secure ea...

Page 30: ...ce Loosen and adjust position of set screws and long hex bolt to fit holes in B 5 connector Position B 5 connector with the long hex bolt in center hole and center to the seam where the profiles join...

Page 31: ...back profiles Turn the roof ridge over so bolts face down and rest on top of front and back walls 7 3A Working from outside ensure all pieces are still flush and secure roof ridge to front Loosen set...

Page 32: ...to install roof Allow enough time to complete this step and install and secure roof Do not leave roof unattended until it is completely assembled The roof panels are installed in the sections shown b...

Page 33: ...in back left corner Fit one F 1 profile next to right panel F 1 profile rests against widest part of roof ridge and lines up with top of gutter Hold two profiles together at ridge using one B 4 connec...

Page 34: ...tall F 1 profile on opposite side B 4 F 1 B 4 F 1 8 4A F 1 G 2 W 1 Return to back right to install section three and remove bungee cord Remove plastic film from both sides of one W 1 panel With side m...

Page 35: ...F 1 profile so both panels fit in channels on sides of F 1 profile Slide the F 1 profile up towards the roof ridge As the profile moves up have the person on the inside guide it into place F 1 B 4 S...

Page 36: ...S 2C caps The G 4 and G 4E trim plates snap into G 1 and G 2 gutter profiles to hold roof panels in place Working from outside begin at front corner Run a bead of silicone sealant along ledge of G 1 a...

Page 37: ...ne up with holes in arm A Push arms apart if necessary Secure with a threaded stud on each side Remove plastic film from both sides of V 2 factory assembled vents With side labeled Face inside facing...

Page 38: ...ith arm overlapping trim so adjusting screw can move freely Screw two S 1 screws through panel and into gripping channel on other side to secure Do not over tighten as it may damage the vent From insi...

Page 39: ...Begin right door assembly Prepare one E 2 door profile Position with holes facing up Slide one D 9 corner connector into each end Slide E 1 door profiles into D 9 corner connectors and secure each wit...

Page 40: ...in step 10 6B Turn door over and install handle on E 2 profile just secured Match two holes in E 2 with holes in D 6 handle Secure with two S 10 screws Repeat step 10 1 through 10 2A to assemble left...

Page 41: ...and F 5 profiles that make up the door frame and to inside E 1 bottom door profiles This tape acts as insulation Make sure it is smooth and even Working from inside with left door open and right door...

Page 42: ...platform until each screw is flush with base profile Continue process around outside and inside until greenhouse is evenly secured Attach anchor bracket with two T bolts in the inside bolt channels in...

Reviews: