![Riverstone Networks Monticello Mont-8-BK Assembly Instructions Manual Download Page 34](http://html1.mh-extra.com/html/riverstone-networks/monticello-mont-8-bk/monticello-mont-8-bk_assembly-instructions-manual_1466185034.webp)
WWW.RSIWW.COM
32 of 40
B-4
S-2C
2
1
Connector
QTY
W-1
3
Panel
QTY
24” x 57”
Connector
QTY
S-7
6
R-1
F-7
F-7
G-1
G-1
W-1
W-1
8.3A
R-1
F-1
F-1
B-4
Hold two profiles
together at ridge
using one B-4
connector. Secure
with two T-bolt
assembies .
8.3c
Continue working from front right corner Remove plastic film from both
sides of one W-1 panel. With side marked “ UV Resistant”
facing outside, fit top end of panel into channel
in roof ridge near corner. Push panel into roof
ridge channel until the other end rests on
gutter ledge and then slide towards
F-7 corner profile. Repeat to
install W-1 panel in front
left corner.
NOTE: VIEWS FROM OUTSIDE.
NOTE: VIEWS FROM INSIDE.
8.3B
Fit one F-1 profile next to panel. Fit lower
end into B-4 connector and secure with
one T-bolt assembly as shown. Repeat to
install F-1 profile on opposite side.
B-4
F-1
B-4
F-1
8.4A
F-1
G-2
W-1
Return to back right to install section three
and remove bungee cord. Remove plastic film
from both sides of one W-1 panel. With
side marked “ UV Resistant” facing
outside,install the next panel on the
right at the back. Push panel into roof
ridge channel until the other end rests
on gutter ledge and then slide towards
F-1profile at back.
NOTE: VIEWS FROM INSIDE.
From inside, hold profile in place with one B-4
connector. Secure with two
T-bolt assemblies as shown.
8.4B
F-1
B-4
F-1
F-1
B-4
F-1
8.4c
Remove plastic film from both sides of W-1 panel. With side marked “
UV Resistant” facing outside, install the next panel on the left at the
back. Push panel into roof ridge channel until the other end rests on
G-2 gutter ledge and then slide towards F-1 profile at back. Repeat
to install W-1 panel
next to it on left. Push
panel towards front.
F-1
F-1
G-2
W-1
W-1
B-4
S-2C
2
1
Connector
QTY
W-1
3
Panel
QTY
24” x 57”
Connector
QTY
S-7
2