
18
SteelConnect Gateway Hardware Installation Guide (SDI-130, SDI-330, SDI-1030)
Installing the SteelConnect Gateways
Replacing the power supplies in the SDI-1030
2.
Plug the AC power cord into the power source.
Figure 2-9. Connecting the AC power
3.
Plug the AC power cord into an uninterrupted AC power source.
4.
Press the system power switch on. If the appliance doesn’t immediately power on, press the power
switch off, and then press the power switch on again.
5.
Check the status lights on the appliance.
Replacing the power supplies in the SDI-1030
The SDI-1030 ships with two power supplies that can be replaced.
Removing the power supplies
1.
Grasp the handle on the failed power supply and pull the power supply out of the bay.
Figure 2-10. Removing the power supply
2.
If you are installing a new power supply, see
“Installing the power supplies” on page 18
for
instructions.
3.
If you are leaving the bay empty, place the power supply bay cover over the opening. Use a
screwdriver to tighten the screws and secure the cover over the opening.
Installing the power supplies
1.
Remove the new power supply from its packaging and position it into the power supply bay.