
SteelConnect Gateway Hardware Installation Guide (SDI-130, SDI-330, SDI-1030)
13
2
Installing the SteelConnect Gateways
This chapter describes how to install or mount the SteelConnect gateway appliances and discusses the
following topics:
“Site preparations or considerations” on page 13
“Required tools and equipment” on page 14
“Mounting the SDI-130 and SDI-130W gateways” on page 14
“Rack mounting the SDI-330 gateway” on page 15
“Rack mounting the SDI-1030 gateway” on page 16
“Powering the gateways” on page 17
“Replacing the power supplies in the SDI-1030” on page 18
Site preparations or considerations
“Safety information” on page 13
“Environmental considerations” on page 14
Safety information
Do not attempt to service the appliance. This sealed unit contains no user-serviceable parts or
adjustments. Do not open or tamper with the power supply.
Carefully inspect the work area in which the appliance will be located to ensure against hazards
such as damp floors, ungrounded power extension cords, and missing ground connections.
Before you connect the appliance to power, locate the power OFF switch on the appliance and
locate the main circuit breaker for the room in which the appliance is installed. If an electrical
accident occurs, turn power OFF immediately.
Before operating the appliance, ensure that external power sources comply with the requirements.
Ensure that the ampere rating of all equipment plugged into wall outlets does not exceed the
capacity of the outlet.
If you require an extension cord, ensure that the ampere rating of all equipment plugged into the
extension cord does not exceed the cord’s ampere rating.
If the appliance is exposed to moisture or condensation, disconnect it from the power source
immediately and obtain service assistance.