3
Remove wrapping and wash unit, removing all road debris. (Road salt, mud, snow, etc.)
Inspect paint, decals and general appearance of unit.
Verify that the owners manual is in the manual storage tube.
Verify
‘
SLOW MOVING VEHICLE
’
sign (SMV) is on unit
Verify that jacks are with the unit and function properly.
Check wheel bolts for proper torque.
Check for proper tire pressure (PSI).
Verify that the wheel hubs are lubricated.
Verify that locking pins and / or ram locks are in place.
Lubricate all components as per operators manual recommendation.
Check that all bolts and fasteners are at the proper torque specifications.
(NOTE:
All cap screws that have lock nuts joining moving pieces should not be tightened completely,
they must allow movement. i.e. Spring pressure kits, rock shaft connector, draft arm, etc.
Check sprocket alignment and chain tension. (If applicable)
Check locking collars and set screws for proper tension. (If applicable)
Verify operation of lights. (If applicable)
Verify the unit moves
‘
IN
’
and
‘
OUT
’
of transport without any binding.
Verify that tires are tracking properly when in transport mode.
Insure that all hydraulic hoses and lines are routed properly and secured.
Verify that all hydraulic fittings / hoses are secure and there are no oil leaks.
Inspect all cylinders for leakage and the cylinder shaft for rust, pits, or scratches.
Verify operation of all hydraulic functions
-
Cycle hydraulic cylinders to remove air from the system.
Verify that
‘
The customer is aware of warning decals and proper jack placement for transport.
’.
Verify that
‘
The customer is aware of proper operation and transportation of the unit
’.
Verify that
‘
The customer has received an operators manual
’.
Explain all maintenance and service intervals to the customer (From operators manual).
Advise the customer of grease zerk locations and maintenance schedules.
Level the unit per operators manual and instruct the customer on the proper procedures.
Verify that the center harrow section has been rotated to working position.
Pre
-
delivery Inspection Completed By (Sign Below)
Pre
-
delivery Inspection Confirmed By (Sign Below)
Summary of Contents for HH-8200
Page 1: ...Operation Maintenance Manual...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ......
Page 15: ...8...
Page 16: ...9...
Page 18: ...11 Grease should be applied to both sides of the machine 2x 2x 2x...
Page 19: ...12 Grease should be applied to both sides of the machine 2x 4x...
Page 31: ...24...
Page 32: ......
Page 33: ......
Page 34: ...2 13 9 18 4 16 13 11 3 14 10 2 6 8 15 7 12 5 16 16 17 1...
Page 36: ...4 2 6 7 5 9 9 12 3 10 8 11 4 13 14 14 10 1...
Page 38: ...6 25 26 1 22 28 14 17 2 3 23 18 12 6 15 14 5 27 9 4 8 21 15 13 21 20 7 10 18 20 14 19 16 11 24...
Page 42: ...10 22 4 11 6 21 20 1 7 18 12 15 13 8 3 5 9 10 14 19 16 2 17...
Page 44: ...12...
Page 46: ...14 13 16 19 9 8 6 4 2 22 23 21 24 1 5 7 7 14 17 11 6 24 25 1 14 17 11 15 20 11 12 18 10 3...
Page 48: ...16...
Page 50: ...18...
Page 54: ...22...
Page 56: ...24...
Page 58: ...26...
Page 67: ...35...
Page 84: ...52...