![RITE-HITE Dok-Lok STR-4100 Installation Manual Download Page 9](http://html1.mh-extra.com/html/rite-hite/dok-lok-str-4100/dok-lok-str-4100_installation-manual_1464528009.webp)
Pub. No. 1243 — April 2008
9
RITE-HITE
®
STR-4100 DOK-LOK
®
Installation Manual
INSTALLATION CONT.
From
P
Port On Restraint Valve Block
To
RP
Port On Combination Power Unit Valve Block
From
L
Port On Restraint Valve Block
To
LP
Port On Combination Power Unit Valve Block
WKV
(SOL 2)
LIP BLOCK
Solenoid
WKX
(SOL1)
RAISE
Solenoid
WKC
(SOL3)
RAMP DIVERT
Solenoid
FIGURE 7 - HOSE ROUTING - COMBINATION POWER UNIT
From
L
Port On Valve Block
To
L
Port On Power Unit
From
P
Port On Valve Block
To
P
Port On Power Unit
FIGURE 6 - HOSE ROUTING - STAND ALONE POWER UNIT
NOTE:
DO NOT Overtighten Hose Fittings!
NOTE:
DO NOT Overtighten Hose Fittings!