![RITE-HITE Dok-Lok STR-4100 Installation Manual Download Page 16](http://html1.mh-extra.com/html/rite-hite/dok-lok-str-4100/dok-lok-str-4100_installation-manual_1464528016.webp)
16
Pub. No. 1243 — April 2008
RITE-HITE
®
STR-4100 DOK-LOK
®
Installation Manual
OPTIONAL POWER UNIT MOUNTING LOCATION
Optional Power Unit Mounting Location.
Ensure Hoses Are Protected By Channel Or Other
Means. Protection Not To Project More Than 3 Inches
Off Dock Face. Protection Must Extend Down To 8
Inches Off Of The Approach. Must Notch Out A section
For Sensor Wires To Pass Through To Junction Box.
Consult Factory For Specific Applications.
Wire Power Unit
Into Control Box
Outside Electrical
Junction Box
Pit Center Line
Dock Floor
Approach
Control Box
FIGURE 18 - OPTIONAL HYDRAULIC INSTALLATION
Optional Routing:
Hydraulic
Hoses Secured To Dock Face
Optional Routing:
Three
Sensor Wires
Optional:
Channel Or Other
Hose/Wire Protecting Device
Optional:
Channel or Other
Device Notched For Three
Sensor Wires
Optional:
Power Unit
Mounting Location
48” Approx.