BARRIER
®
GLIDER Single Slide Model 7100
PUB. NO. 7100SSG FEBRUARY 2008
3
INSTALLATION INSTRUCTIONS
It is important to verify the following basic information
before starting with the installation.
TO PREVENT DAMAGE TO CONTENTS, STORE DRY
BETWEEN 40° AND 80° F.
1.
Make sure that you are working at the correct location and
that you have any special work permits.
2.
Inspect the installation site to make sure that there are no
overhead obstructions (sprinkler pipes, HVAC systems,
electrical supply lines, etc.) that might interfere with the
lifting of the header assembly during installation.
3.
Detour material handling equipment (fork lift trucks, etc.)
during the installation of the door.
4.
Make sure that the electrician is ready to bring the
correct electrical power supply to the door control box.
5.
Make sure that the electrical power can be shut off
without interfering with other plant operations.
6.
Move the entire crate of the door components as close to
the door opening as possible.
7.
When unpacking the door components remove the lighter
items first (electrical components), then the support
posts, and the header assembly last.
8.
Measure the overall width of the door opening near the
floor and the top (Dimensions A and B),
Figure 1.
9.
Measure the height of the door opening at the left and
right-hand sides (Dimensions C and D),
Figure 1.
10.
These dimensions should be within ±1" of the dimensions
listed on the Serial Number label. If the measurements
do not agree, STOP! Contact your
RITE-HITE
DOORS,
INC. representative.
11.
Using a 6’ carpenter’s level, verify that the door jambs
are plumb and perpendicular, the header and floor are
level, within ±1". If the floor is not level to within 1",
shimming of the support post will be required,
Figure 1.
12.
When removing the panels from the crates. Be sure not
to lean panels such that they crease.
13.
Remove header from the crate by removing the front and
motor side of the crate. Slide the motor off the edge of the
crate and stand up. There will be a block under the C-
Channel to keep the motor off the floor, this will allow a
fork lift to pick up the header using the header lifting tubes.
14.
Remove plastic rivets and keep in a warm place.
15.
D.O.W. / H. = Door Opening Width / Height
16.
O.D.W. / H. = Ordered Door Width / Height
17.
Be sure to install optional equipment last after verifying
door operation.
NOTE: Check for electrical prints included in the parts or
control box, as they supersede any prints included
in this owners manual on
Pages 16-18.
POLY LUMBER INSTALLATION
1.
If the door is equipped with the optional poly lumber,
install per
Figure 1A.
2.
Caulk behind poly lumber that surrounds the opening.
3.
Install vertical pieces at ordered door width and then
bottom horizontal piece at door ordered height.
4.
Place small pieces behind header and support post tabs
after posts and header are in place.
LISTING OF MEASUREMENTS AND
MARKINGS REQUIRED
1. Door width at bottom
2. Door width at top
3. Door height left
4. Door height right
5. Mark left wall where water is level.
6. Mark right wall where water is level.
C
D
Hydro-Level
A
B
48”
High Side
Low Side
Level
FIGURE 1
Shim This Side
Make sure to barricade the door opening on both
sides to prevent unauthorized use until the door has
been completely installed.
C A U T I O N ! ! !
!
When working with electrical or electronic controls,
make sure that the power source has been locked out
and tagged according to OSHA regulations and
approved local electrical codes.
D A N G E R ! ! !
!
FIGURE 1A
Header Thru-Bolt Poly
Lumber Tab. Place Behind
Pre-Drilled Mounting Hole
Support Post Thru-Bolt
Poly Lumber Tab.
Place Behind Pre-
Drilled Mounting Hole
Horizontal Air Bag
Poly Lumber
Vertical Air Bag
Poly Lumber
D.O.W.
D.O.H.