background image

OmniMaster 8 Fountain Installation Instructions 

 

 

 

 

 

 

 

 

 

 

 

 

 

A.

 

Location  - 

Putting the fountain in a location that offers protection from the wind will enhance the 

performance of the fountain. Livestock will tend to gather in this protected area, enticing them to drink 

more. Access panel should be opposite of prevailing winter wind to give additional protection to the 

supply line.

  

B.

 

Water Supply Line

  -  Horizontal underground water line should be sized to account for pressure 

drop, relating to distance, and placed one foot below frost line. A one-inch vertical supply pipe is 

recommended. A shut-off valve should be installed under fountain to allow for easier servicing. For 

optimum serviceability, a stop and waste valve can be installed below frost level to drain water when unit 

is not in use. Vertical supply line must be centered in riser tube to provide an air space between the line 

and frozen ground outside of tube. Flush water supply line thoroughly before connection to fountain. 

Water supplies with foreign material such as sand, rust, etc. may require a filter to keep fountain valve 

working properly. 

C.

 

Electric  Supply 

–  It is generally most cost effective to run your electrical supply line at the same 

time you are trenching for your water supply.

 

WARNING:  ANY ELECTRICAL SERVICE MUST BE INSTALLED AND MAINTAINED BY A 

QUALIFIED ELECTRICIAN PER LOCAL CODES. 

 

OmniMaster Series Instruction Manual

1

11 October, 2017

Summary of Contents for OmniMaster 8

Page 1: ...fountain on the market This unit is built to give you excellent service when properly installed and maintained Please follow instructions carefully Read and understand all instructions before installi...

Page 2: ...stalled under fountain to allow for easier servicing For optimum serviceability a stop and waste valve can be installed below frost level to drain water when unit is not in use Vertical supply line mu...

Page 3: ...and platform should slope away from the fountain for drainage A rough broom finish to concrete surface provides better footing for livestock F Anchoring Fountain OmniMaster 8 fountains have mounting...

Page 4: ...r Uncoil cable heater and loop around the valve Attach the remaining part of the cable heater to the water supply as far down the riser tube as possible with the cable twist ties provided This heater...

Page 5: ...MAY RESULT IN LOSS OF LIVESTOCK PERSONAL INJURY OR DEATH NOTE National Local electrical codes may require livestock waterers installed in feedlots in open feeding area to be grounded by a separate str...

Page 6: ...ormance N Drain Plug Insert the pre assembled drain plugs firmly into the drain holes from inside the trough at each end Wetting the plug can aid in installation O Valve Frame and Cover Before install...

Page 7: ...gs to drain out the water and debris You can shut off the water with the shut off valve located under the unit or by holding the float in the up position After the water and debris has drained reinsta...

Page 8: ...ered in riser tube Check that riser tube is free of water and mud that may freeze Check that flexible hose does not touch side of casing or frame Check casing for air leaks Check for air gaps between...

Page 9: ...3 Short 2 8 18452 Bolt 3 8 x 3 SS 2 pkg 1 pkg NS 14866 Seal Foam 10 Roll 3 9 18854 OM 8 Frame Screws 1 pkg NS 15931 Hose Clamp 1 SS 5 pkg 1 pkg 10 18448 T Bolt w Wingnut 3 8 pkg 1 pkg NS 18614 Adapte...

Page 10: ...rights which vary from state to state All warranty claims must be processed through an Authorized Ritchie Dealer Distributor Proof of purchase is required This warranty is not transferable The period...

Reviews: