Rinnai 36
SS850 Freestanding IM
IMPORTANT
It is the responsibility of the installer to complete both the "Installation Checklist" below and
the "Installation Record" on the next page and in the Operation Manual at the completion of
installation.
IMPORTANT
Instruct customer on the heater operation and ensure the customer understands the content of
the operation manual.
Advise the customer that during the initial burning period of approximately 2 hours, some smoke
and odour may be experienced.
During this period the heater should be operated on ‘High’ and the space being heated should be
well ventilated. It may take up to 20 minutes of operation for the logs to achieve their full flame
pattern and glow.
Complete the "Installation Record" on the next page and in the Operation Manual
WARNING
THE GUARD IS FITTED TO THIS APPLIANCE TO REDUCE THE RISK OF FIRE OR INJURY
FROM BURNS AND NO PART OF IT SHOULD BE PERMANENTLY REMOVED.
FOR PROTECTION OF YOUNG CHILDREN OR THE INFIRM, A SECONDARY GUARD IS
REQUIRED.
The guard supplied with this appliance
MUST NOT
be permanently removed as it fulfils an
operational safety function. Additional dress guards including free standing types may be used
in conjunction with, but
NOT
replace, the dress guard supplied with this appliance.
The appliance is not intended for use by young children or infirm persons without supervision.
Young children and the infirm
SHOULD
be supervised at all times when in the vicinity of this
heater while it is in operation.
Ensure the Customer understands that:
•
No part of this appliance should be permanently removed.
•
Young children and the infirm should be supervised at all times.
•
Paper or other material
MUST NOT
be burnt in this appliance.
IMPORTANT
The following checklist is to be completed
ONLY
by a Certified Gas Installer.
No Yes
1.
Is the appliance positioned in a suitable location (clearances, combustible clearances, mantels
and surrounds etc.)?
2.
Was a Rinnai approved flue system installed and tested in accordance with the instructions?
3.
Has the gas pressure been checked and set with all gas appliances running?
4.
Has the log set / burn media been installed as per instructions?
5.
Has the appliance tested for correct operation and to ensure no gas leaks?
6.
Has combustion product spillage testing been conducted in accordance with AS/NZS5601?
7.
Has the customer been instructed on operating procedure and safety requirements?
8.
Is the end-user fully aware of operating procedure and has the manuals?
9.
Has the Glass or Mesh Dress Guard been fitted?
10.
Has the customer been advised not to remove the Dress Guard?
11.
Has the customer been advised to service the heater every two years?
INSTALLATION CHECKLIST