Rinnai
26
Installation Manual
HEATER INSTALLATION
10.INSTALLING THE FASCIA PANEL
11.INSTALLATION AND COMMISSIONING CHECKLIST
•
Complete the ‘Customer Record' on page ii and the Final Checklist (Step 12.) below.
•
Instruct customer on functions and operation of the heater and remote control.
•
Ensure the customer understands the content of this manual.
12.FINAL CHECKLIST
Remove
DO NOT DISCARD
the two fascia retaining screws
shipped installed in the lower fascia
mounting brackets
of the heater engine.
Mount the fascia
by hooking the top of the fascia
to the body and rotating the bottom
in
towards the engine body.
Using the fascia retaining screws
secure the fascia to the heater engine through the front of the
warm air discharge louvre
.
Advise the customer that during the initial burning period of approximately 2 hours,
some smoke and smell may be experienced. During this period the heater should be
operated on ‘High’ and the space being heated should be well ventilated.
•
For protection of young children or the infirm a secondary guard is required.
•
Ensure this Operation and Installation manual is left with the customer.
Ensure the Customer understands that:
No part of this appliance should be permanently removed.
Paper or other material must not be burnt in this appliance.
Young children and the infirm should be supervised at all times.
(To be completed by certified Gas Installer)
NO / YES
1. Appliance positioned in a suitable location
(clearances, combustible clearances, mantels and surrounds etc).
2. Is a Rinnai approved flue system installed & tested in accordance with the instructions?
3. Gas pressure checked and set?
4. Has the burner media been installed as per instructions?
5. Appliance tested for correct operation and to ensure no gas leaks?
6. Customer instructed on operating procedure and safety requirements
7. Is the end-user fully aware of operating procedure?