FALSE FIREPLACE INSTALLATION
WARNING
When installing the Rinnai Ember into a purpose built mock chimney or chase, which is not open
to the roof space of the building, you will need to add cavity vents.
Heat from the fire lost through the outer skin of the appliance and the flue system will not be able
to adequately vent. This can lead to a build-up of excess heat in the cavity. In some cases the fire
may overheat and the overheat safety mechanisms may operate.
Adding two vents of at least 200 cm
2
one at floor level and one at ceiling level, will allow adequate
airflow in a cavity of approximately 1.2 m wide x 2.4 m high and 0.8 m deep. An additional benefit
is that the ventilation of the cavity will return some of this heat Into the room.
IMPORTANT
Read this manual thoroughly and gain a full understanding of the requirements before undertaking
installation. Ensure gas supply to heater is turned off for the first stages of this instruction.
Step 1
Prepare Site – p.19
Step 8
Prepare Gas Supply – p.22
Step 2
Unpack The Heater Engine – p.19
Step 9
Inserting Heater Engine & Connecting Flue
Spigot Plate – p.22
Step 3
Install Flue – p.20
Step 10
Securing The Heater Engine – p.22
Step 4
“Zero Clearance Frame Installation” – p.21
Step 11
CONNECTING THE GAS SUPPLY – p.23
Step 5
Install Cladding – p.21
Step 12
LEAK TESTING – p.23
Step 6
Positioning the Heater Engine– p.22
Step 13
BURNER MEDIA INSTALLATION – p.24
Step 7.
Connect Electrical Supply – p.22
Step 14
COMMISSIONING INSTRUCTIONS – p.27
Step 1. Prepare Site
IMPORTANT
Ensure the intended enclosure meets the requirements of the dimensions as stipulated in
“ENCLOSURE REQUIREMENTS” on page 8 and that gas and electrical supplies have been
prepared in accordance with the dimensions stipulated in “GAS SUPPLY” on page 10 and
“ELECTRICAL SUPPLY” on page 11.
Ensure there are no wall studs, noggins, ceiling joists, wiring or other obstruction within the wall
and or ceiling cavity where the flue is proposed to penetrate.
Step 2.
Unpack The Heater Engine
The heater engine is supplied in one carton, check to ensure you have all contents as listed under “BEFORE
YOU START” on page 7 at the start of this manual before proceeding. Carefully remove carton by removing
the straps and lifting the carton off the appliance. Remove all packaging materials and check all components for
damage. If
ANY
damage is evident
DO NOT
install or operate this appliance. Contact your supplier for advice.
HINT
Retain the cardboard carton for use in the “Positioning The Heater Engine” on page 22.
INSTALLATION