Rinnai 30
RDV 600_700ER IM
COMMISSIONING THE APPLIANCE FOR DIFFERENT GAS TYPE
WARNING
230 VOLTS, RISK OF ELECTRICAL SHOCK!
Installation and commissioning
MUST
be carried out
ONLY
by an Authorised person.
Wiring inside this appliance may be at 230V potential, when performing the commissioning, the
appliance electrical power will need to be connected. Exercise
CAUTION
as there is potential for
electric shock from the exposed wiring and circuitry.
DO NOT
leave the appliance unattended
when power is connected and the panels are removed.
This appliance is factory set for the correct gas type as per it's gas type labelling, re-commissioning for gas type will
only be required if the PCB is being replaced or if it has undergone a gas type conversion, i.e.; from NG to Propane
or vice versa. Commissioning of the gas is carried out via the PCB.
NOTE
Commissioning of the PCB
MUST
be carried out BEFORE the gas pressures are checked.
1. Turn on the gas and power supply to the appliance.
2. Press the 'UP' button or 'DOWN' button to obtain the correct gas type code for the appliance. Refer to chart
to below for the correct gas type code.
Natural Gas
Propane Gas
A1
L1
3. With the appliance OFF, press the 'TEST' button, the gas type code will be shown on the display.
4. Press the 'SET' button, to lock in the code.
5. Gas pressure settings should now be checked as per “Checking and setting Pilot burner pressure” on page
28, Steps 1 through 3.
6
8 13
12
7
11
9
10
COMMISSIONING