Infinity REU-3203W
- 47 -
©Rinnai
10)
Removal of the
Heat Exchanger
a. Remove front panel (4 screws). (Refer Item 1.)
b. Remove the PCB. (Refer Item 2.b.)
c. Remove heat exchanger water supply pipe and
bypass pipe. Refer to 3).
d. Remove one (1) HEX HW pipe screw and pull the
hot water pipe forward. Handle O-ring carefully..
e. Remove the two (2) screws fixing the manifold
and gas control.
f. Remove four (4) heat exchanger unit screws.
g. Remove connectors of the fan motor, thermal
fuse, flame rod etc.
h. Pull the heat exchanger unit forward and out.
11)
Removal of the
Thermal Fuse and OHS
a. Remove front panel (4 screws).
b. Take out the heat exchanger unit. Refer to 10).
c. Remove the thermal fuse.
Note:
After replacing, install the thermal fuse as in the
following diagrams.
Heat Exchanger RHS
Heat Exchanger Front
Summary of Contents for INFINITY REU-3203W
Page 1: ...INFINITY REU 3203W Infinity High Capacity Continuous Flow Gas Hot Water System SERVICE MANUAL...
Page 12: ...Infinity REU 3203W 7 Rinnai 4 Dimensions A Gas 41 Cold Water 51 Hot Water 42 Power 27...
Page 16: ...Infinity REU 3203W 11 Rinnai 7 Cutaway Diagram...
Page 54: ...Infinity REU 3203W 49 Rinnai 21 Exploded Diagram...
Page 55: ...Infinity REU 3203W 50 Rinnai...
Page 56: ...Infinity REU 3203W 51 Rinnai...
Page 57: ...Infinity REU 3203W 52 Rinnai...
Page 61: ...Infinity REU 3203W Rinnai Notes...
Page 62: ...Infinity REU 3203W Rinnai...
Page 63: ...Infinity REU 3203W Rinnai...