7 Maintenance
7-1. Maintenance intervals and items
SD-1DGH-AS
- 40 -
7
Maintenance
The detector is an important instrument for the purpose of safety.
To maintain the performance of the detector and improve the reliability of safety, perform a regular
maintenance.
7-1. Maintenance intervals and items
Daily maintenance:
Perform a maintenance before beginning to work.
Monthly maintenance: Perform maintenance on the alarm circuit (alarm test) once a month.
Regular maintenance: Perform maintenance once or more for every six months to maintain the
performance as a safety unit.
Maintenance
item
Maintenance content
Daily
maintenance
Monthly
maintenance
Regular
maintenance
Power Supply
Check
Check that the power lamp lights up.
Concentration
Display Check
Check that the concentration display
value is zero. When the reading is
incorrect, perform the zero adjustment
and span adjustment after ensuring that
no other gases exist around it.
Flow rate
check
Check the flow rate to find
abnormalities.
Filter check
Check the dust filter for dust or clogging.
Alarm Test
Inspect the alarm circuit by using the
alarm test function.
Span
Adjustment
Perform the span adjustment by using
the calibration gas.
Gas Alarm
Check
Check the gas alarm by using the
calibration gas.
Summary of Contents for PT2-169
Page 1: ...PT2E 2525 Smart Transmitter Gas Detector Head SD 1DGH AS Operating Manual PT2E 170 PT2 170...
Page 4: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 12: ......
Page 15: ......
Page 19: ......
Page 20: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 28: ......
Page 29: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 38: ......
Page 43: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 62: ...10 Product Specifications 10 1 List of specifications SD 1DGH AS 62 Outline Drawings...
Page 65: ......