5 How to Operate
5-1. Preparation for start-up
- 27 -
SD-1DGH-AS
5
How to Operate
5-1. Preparation for start-up
Before supplying power, read and understand the following precautions. Ignoring these precautions may
cause an electric shock or damage the detector.
Connect the detector to a grounding circuit.
Check that the wiring is connected to external device properly.
Check that the power supply voltage is compliant with the specifications.
Because the external contact may be activated during the adjustment, take measures to prevent an
activated contact from having influences on external device.
Check that there is no clogging or leak in the connected tube. (If the connected tube is clogged, pressure
is applied to the sensor, causing errors and malfunctions.)
Check that the filter is attached properly. (The filter is specified based on the gas to be detected.)
Summary of Contents for PT2-169
Page 1: ...PT2E 2525 Smart Transmitter Gas Detector Head SD 1DGH AS Operating Manual PT2E 170 PT2 170...
Page 4: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 12: ......
Page 15: ......
Page 19: ......
Page 20: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 28: ......
Page 29: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 38: ......
Page 43: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 62: ...10 Product Specifications 10 1 List of specifications SD 1DGH AS 62 Outline Drawings...
Page 65: ......