
25
➧
Clean the inserted intermediate floor
(Fig. 5, Part 33) (e.g. with vacuum cleaner)
and then remove from combustion
chamber
➧
Now vacuum the combustion residue
from the manifold channel.
➧
Fit the parts in the reverse order again.
Attention must be paid to a tight fit.
Fig 5
Cleaning the flues
Fig 7
➧
Refit the parts you removed in the
reverse order.
Fig 4
Fig 6
CLEANING THE FLUE MANIFOLD
The heating flue is located in the bottom of
the combustion chamber (Fig. 7 to Fig. 10)
➧
After removing the front panels (see
page 15, remove cast cover and
dismantle front panel, Fig. 6, 47)
➧
Open the grate door
➧
Dismantle the bottom inspection
opening Fig. 5, 33 (four wing nuts)
Fig 8
Fig 9
EN
GL
ISH
Summary of Contents for PREMIO
Page 1: ...M A N U A L P R E M I O 8 k w The life and soul of your home R I K A S T O V E S ...
Page 2: ...2 View from rear Intake air duct combustion air Fig 1 Fig 2 Flue pipe connection ...
Page 3: ...3 Fig 3 ...
Page 4: ...4 Fig 4 ...
Page 5: ...5 Fig 5 ...
Page 6: ...6 Fig 6 ...
Page 31: ...E N G L I S H ...
Page 32: ...1 3 E C D E C L A R AT I O N O F C O N F O R M I T Y E N G L I S H 32 ...
Page 33: ...E N G L I S H 33 ...
Page 36: ...W A R R A N T Y Customer Address Stamp Z Nr 2212 0200 00 Art Nr Z32248 Prod Nr 01 2008 ...