INSTALLER
31
B
A
r g
boilers must be connected to the terminal
strip inside the control panel (see the diagram on pages
11-12). This must be done by the heating engineer or a
qualified electrician.
Proceed as follows to access the control panel terminal
strip:
- Remove the front and top panels (A) and (B).
- Unscrew the screws (C) and remove the cover (D).
B
A
g
N
g
NK
C
D
WIRING