20175134
30
GB
Start-up, calibration and operation of the burner
6.1
Notes on safety for the first start-up
6.2
Adjustments prior to ignition
Combustion head adjustment has already been already de-
scribed in the section “Combustion head adjustment” on page 24.
In addition, the following adjustments must also be made:
open manual valves upstream from the gas train;
adjust the minimum gas pressure switch to the start of the
scale;
adjust the maximum gas pressure switch to the end of the
scale;
adjust the air pressure switch to the start of the scale;
adjust the pressure switch for the leak detection control
(PVP kit) (Fig. 37 on page 39) according to the instructions
supplied with the kit;
purge the air from the gas line.
We recommend using a plastic tube routed outside the build-
ing and to purge air until gas is smelt.
Fit a U-type pressure gauge or a differential pressure gauge
(Fig. 27), with socket (+) on the gas pressure of the pipe
coupling and (-) in the combustion chamber.
The manometer readings are used to calculate MAX burner
output using the Tab. N.
Connect two lamps or testers to the two gas line solenoids to
check the exact moment in which voltage is supplied. This
operation is unnecessary if each of the two solenoids is
equipped with a pilot light that signals voltage passing
through.
6
Start-up, calibration and operation of the burner
WARNING
The first start-up of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and regula-
tions of the laws in force.
WARNING
Check the correct working of the adjustment, com-
mand and safety devices.
WARNING
Refer to paragraph “Safety test - with gas ball
valve closed” on page 37 before the first start-
up.
CAUTION
Before starting up the burner, it is good practice to
adjust the gas train so that ignition takes place in
conditions of maximum safety, i.e. with gas deliv-
ery at the minimum.
Fig. 27
20069491
Summary of Contents for RS 310/EV O2 BLU
Page 2: ...Translation of the original instructions...
Page 46: ...20175134 44 GB Appendix Electrical panel layout...
Page 49: ...47 20175134 GB Appendix Electrical panel layout...
Page 50: ...20175134 48 GB Appendix Electrical panel layout...
Page 51: ...49 20175134 GB Appendix Electrical panel layout 0...
Page 52: ...20175134 50 GB Appendix Electrical panel layout 0 0 0 1 0 2 0 0 0 0 0 0 0 30 3 3 0 0 1 0...
Page 53: ...51 20175134 GB Appendix Electrical panel layout 0 1 1 1 2...
Page 59: ......