5143
2
DIMENSIONS
WORKING RANGE
PRESSURE IN THE COMBUSTION CHAMBER - 2
nd
STAGE OUTPUT
MINIMUM GAS PRESSURE - 2
nd
STAGE OUTPUT
Pressure
: measured at the test point with combustion chamber at 0 mbar.
Boiler front-plate
drilling
* Extension that you can obtain with special extended head (to be requested separately).
Burner
160
160
155
M10
410
610
187
*
320
397
97
292
165
Rp 1
1/2
D1785
S7564
S7565
ø 150
Kcal/h
mbar
kW
Min output at 1
st
stage 116kW - 10Kg/h
S7590
Kcal/h
mbar
kW
Gas pressure test point
Natural gas
LPG
S7536
S7591