BURNER START-UP CYCLE

Venting the gas supply.
This is done by removing the screw from the gas pressure switch, or the pressure test point.     

AIR PRESSURE SWITCH (17 Fig.1)    

Adjust the air pressure switch after adjustment of all the other
parts of the burner, with air pressure switch setted at beginning
of the scale.

When the burner works (1

st

 stage) increase the regulating

pressure, turning the handle slowly in the clockwise till the
burner is locked out. 
Then turn back of 1 mbar and repeat the burners starting, in
order to verify the good work; if you have a lock out, turn back
once again of 0.5 mbar.

PUMP’S FIRING

In case of drop-plant with supply from the tank’s bottom, back off the plug at the vacuumeter-joint 9)
(fig. 1), till the leaking of fuel.
In the other two situations, start up the burner, bleed the air of manometer-joint 8) P (fig. 1); if you
have a lock-out, repeat the cycle.

ATTENTION
Before starting up the burner, check that the return pipe has no occlusions. 
Any occlusions will cause the break of the pump-sealing organ.

WORK WITH OIL

At the first ignition, when there is the passage from the first to the second flame, there is a strong
decrease of fuel-pressure owing to the filling of second nozzle’s pipe. This decrease can cause the
burn-out of the burner.

COMBUSTION CHECKS

CO

2

It is better to set the burner with CO

2

 not higher than 10% (gas with Pci 8600 kcal/m

3

). 

So you avoid that a little unsetting (for example draft variation) causes combustion with few air and
with the production of CO.

CO
It must be not higher than 0.1% (thousand parts for million) in accordance to UNI-CIG 8042 norme.

Screw

Pressure gauge fixing point

Pressure switch

S7577

1 ÷ 10

mbar

Regulating handle

S7550

Summary of Contents for GI/EMME 400

Page 1: ...2915143 6 Installation use and maintenance instructions Dual fuel Gas Oil Gas burner MODEL TYPE GI EMME 400 496 T80...

Page 2: ......

Page 3: ...8A 220 V Secondary 30 mA 1x8 kV Pump Output 55 kg h at 12 bar max pressure 15 bar Operation Two stages Fig 1 EQUIPMENT Quantity Burner accessories 1 Gas train s gasket 8 Screws 1 Insulating screen 3 S...

Page 4: ...with combustion chamber at 0 mbar Boiler front plate drilling Extension that you can obtain with special extended head to be requested separately Burner 160 160 155 M10 410 610 187 320 397 97 292 165...

Page 5: ...e boiler s plate 6 interposing gasket 5 Mount the group A to the boiler front Fit the nozzles and regulate the combustion head as speci fied below S7539 6 5 4 1 3 2 B A 1 Gas supply pipe 7 Min gas pre...

Page 6: ...be disconnected with out causing any problems H Margin L Inlet pipe s length including the vertical line The copper pipes with diameter 8 and 10 shown in the schemes can be replaced with 1 4 and 3 8...

Page 7: ...aker CO Selector switch MB Burner terminal strip MP Pump motor MV Fan motor PA Air pressure switch RT Thermal relay SM Servo motor TA Ignition transformer TB Burner earth UV Probe U V V1 1 stage valve...

Page 8: ...control system PC Check pressure switch PG Min gas pressure switch TB Burner earth NOTICE The electric wiring carried out by the installer must be in compliance with the rules in force in the country...

Page 9: ...IN gland Pg 13 5 for sheath 13 To guarantee the IP 40 protection level in accordance to CEI 70 1 seal the glands that are not used NOTES Do not exchange Neutral with Phase avoid a plug socket connecti...

Page 10: ...s to holes F Nozzle 1 2 1 2 kg h bar GPH kg h GPH kg h 12 2 50 9 7 2 50 9 7 19 4 10 12 3 00 3 00 10 8 11 7 3 00 3 00 10 8 11 7 21 6 23 4 10 12 3 50 3 50 12 6 14 0 3 50 3 50 12 6 14 0 25 2 28 0 10 12 4...

Page 11: ...lever The orange lever controls the air damper position for the first flame it is adjustable both for opening and closing 2nd STAGE Red and black levers The red lever controls the air damper position...

Page 12: ...fuel In the other two situations start up the burner bleed the air of manometer joint 8 P fig 1 if you have a lock out repeat the cycle ATTENTION Before starting up the burner check that the return p...

Page 13: ...e a microammeter of 100 A c c connected to the photocell as in the scheme with a capacitor of 100 F 10V c c at the same level of the instrument BURNER STARTING UP PROGRAMME If during the work the flam...

Page 14: ...The air pressure switch does not effect a selection because of a fault contact insufficient air pressure LOCK HALT Malfunctions of the flame detection circuit photo sensitive cell exhausted fault inte...

Page 15: ......

Page 16: ...RIELLO S p A Via degli Alpini 1 I 37045 Legnago VR Tel 39 0442 630111 Fax 39 0442 630375 Con riserva di modifiche...

Reviews: