background image

20013654

CN

油路系统

警告

:

启动燃烧器之前,确保回油管无堵塞

任何堵塞会使泵的密封损坏

.

油 泵进 油真 空度 不能 超过

 0.4 bar (30 cm

Hg).

大于这一值,气体可能从油中分离出来

.

油管一定要完全密封

回油管应回到油箱中

与入油管相同的水平高度

在这种情况下,不

需止回阀

.

如果回油管回到比燃料表面高的位置,必须
装一个止回阀

.

这种方法不如前一种方法,因为阀门有可能
漏油

.

首次启动油泵

启动燃烧器直到油泵充油

.

如在燃料到达油泵之前锁定

至少等 20 秒才

能再次启动

.

在供油管路上必须装滤网

.

H

m

L

m

I. D.

8 mm

I.D.

10 mm

0.5

1

1.5

2

10
20
40
60

20
40
80

100

警告

燃烧器油泵是按双管油系统设计运行的

如要单管运行,必须

 

拆下旁路螺钉

 

(A),

 (

参见图

).

A

H

m

L

m

I. D.

8 mm

I.D.

10 mm

0

0.5

1

1.5

2
3

3.5

35
30
25
20
15

8
6

100
100
100

90
70
30
20

H

m

ax. 4 m

H

H

m

ax. 4 m

m

in. 0.1 

m

D5219

D5220

D5199

H

=

高度差

.

L

=

供油管最大长度

.

I.D.

=

油管内径

.

油泵首次启动

松开真空压力表接口螺钉

(5, 

1

,

P1

直到有油流出为至

.

Summary of Contents for G10 LC

Page 1: ...20013654 2 05 2009 Installation use and maintenance instructions Light oil burner CODE MODEL TYPE 20013617 G10 LC 464T1 GB CN One stage operation...

Page 2: ...safety start up use and maintenance of the burner DELIVERY OF THE SYSTEM AND THE INSTRUCTION MAN UAL When the system is delivered it is important that The instruction manual is supplied to the user b...

Page 3: ...ly Single phase 230V 10 50Hz Motor Run current 0 8A 2850 rpm 298 rad s Capacitor 4 F Ignition transformer Secondary 8 kV 16 mA Pump Pressure 7 15 bar Absorbed electrical power 0 170 kW 1 Return line 2...

Page 4: ...9 83 83 170 4 5 105 It is necessary that the insulating gasket 9 fig 1 is placed between the boiler door and the burner flange This insulating gasket has six holes which if necessary can be modified a...

Page 5: ...valve PRIMING THE PUMP Start the burner and wait for the priming Should lock out occur prior to the arrival of the fuel await at least 20 seconds before repeating the operation A filter must be instal...

Page 6: ...neath the ignition transformer on a plug in support TESTING Check the shut down of the burner by opening the thermostats ATTENTION Do not connect burner s grounding to failure indicator terminal This...

Page 7: ...n fitting the nozzle with the blast tube removed It depends on the output of the burner and is carried out by rotating the reg ulating rod till the terminal plane of the blast tube is level with the s...

Page 8: ...per 1 after loosing the screws 2 When the optimal regulation is reached screw tight the screws 2 The settings indicated in the schedule are purely indicative Each installation however has its own unpr...

Page 9: ...ion head one set point further ahead than indicated in the instructions Example the instructions require to set the combustion head on set point 3 Instead the setting is made on set point 4 4 FAN AIR...

Page 10: ...20013654 CN Technical Assistance Centre Assistance Centre Maintenance Contract...

Page 11: ...C 2004 108 EC 73 23 EEC 2006 95 EC 98 37 EEC 92 42 EEC O IP 40 EN 60529 464T1 54 120 kW 4 5 10 kg h 20 C 4 6 mm2 s 230V 10 50Hz 0 8A 2850 rpm 298 rad s 4 F 8 kV 16 mA 7 15 bar 0 170 kW 1 2 3 4 5 6 7 8...

Page 12: ...20013654 2 CN EN 267 0 8 0 0 4 4 5 6 kg h 50 60 120 kW D5669 70 80 90 100 110 0 2 0 6 mbar 7 8 9 10 305 108 261 140 40 4 5 262 1 1 204 D5670 189 83 83 170 4 5 105 9 1 6 D5242 2 2 D5572 S7385...

Page 13: ...Hg 20 H m L m I D 8 mm I D 10 mm 0 5 1 1 5 2 10 20 40 60 20 40 80 100 A A H m L m I D 8 mm I D 10 mm 0 0 5 1 1 5 2 3 3 5 35 30 25 20 15 8 6 100 100 100 90 70 30 20 H max 4 m H H max 4 m min 0 1 m D521...

Page 14: ...20013654 4 CN 50V T6A N L M S7026 1 mm2 A 230V 50Hz N L 230V 0 5A max 1 2 3 4 5 6 7 8 9 530SE T T 1 N 2 L 3 A 3 2 1 D5228...

Page 15: ...B Steinen S Q Danfoss S 12 bar 12 bar 14 bar 12 bar 1 50 GPH 3 6 mm 2 1 3 P 6 GPH bar kg h 4 1 10 60 12 4 4 2 3 1 25 60 12 5 0 2 5 3 4 1 50 60 12 6 0 3 3 8 1 75 60 12 7 0 4 4 2 00 60 12 8 0 5 5 2 25...

Page 16: ...20013654 6 CN CO2 CO2 1 3 3 4 2 1 2 5 9kg h D7178 1 2 D5231 1 2 3 6 D5671 3 4 5 4...

Page 17: ...7 20013654 CN 6 5 C 1 6 2 12 bar 5 C 14 bar 3 3 4 4 1 A 4 0 3 mm D5288 A 4 5 0 5 mm 6 12s D5229 12s 5s...

Page 18: ......

Page 19: ......

Page 20: ...I 37045 Legnago VR Tel 39 0442 630111 http www riello it http www rielloburners com Manufacturing site Riello Heating Equipment Shanghai CO LTD No 388 Jinbai Road Jinshan Industrial Zone 201506 Shang...

Reviews: