background image

20013654

GB

COMBUSTION ADJUSTMENT

In conformity with Efficiency Directive 92/42/EEC the application of the burner on the boiler, adjustment
and testing must be carried out observing the instruction manual of the boiler, including verification of
the CO and CO

2

 concentration in the flue gases, their temperatures and the average temperature of the

water in the boiler.
To suit the required appliance output, fit the nozzle then adjust the pump pressure, the setting of the
combustion head and the air damper opening in accordance with the following schedule.
The values shown in the table are measured on a CEN boiler (as per EN 267).
They refer to 12.5% CO

2

 at sea level and with light oil and room temperature of 20 °C. 

 

RECOMMENDED NOZZLES:

Monarch type R
Delavan  type W - B
Steinen  type S - Q
Danfoss type S

 

PUMP PRESSURE:

12 bar :

The pump leaves the factory set at this value.

14 bar :

Improves flame retention; it is therefore suitable for ignitions at
low temperatures.

 

COMBUSTION HEAD SETTING

This is done when fitting the nozzle, with the
blast tube removed. It depends on the output of
the burner and is carried out by rotating the reg-
ulating rod, till the terminal plane of the blast
tube is level with the set-point, as indicated in
the schedule. 
In the sketch on the left, the combustion head is
set for an output of  1.50 GPH at 12 bar, while
the shutter is level with set-point  

3

, as required

by the above schedule.
 
Combustion head settings indicated in the
schedule are valid for most cases.
The setting of the fan output according to the installation should normally be done only through the air
damper. Should one subsequently want to retouch also the setting of the combustion head, with the
burner running, operate on the rod 

(1)

 with a 6 mm spanner 

(2)

 as follows (see fig. 3, page 6).

Nozzle

Pump pressure

Burner output

Comb. head 

adjustment

Air damper

adjustment

GPH

Angle

bar

kg/h ± 4%

Set-point

Set-point

1.10

60°

12

4.4

2

3

1.25

60°

12

5.0

2.5

3.4

1.50

60°

12

6.0

3

3.8

1.75

60°

12

7.0

4

4

2.00

60°

12

8.0

5

5

2.25

60°

12

9.0

6

6

2.50

60°

12

10.0

6

7

1

2

3

4

1

For 2.00 - 2.25 GPH nozzles it is
advisable to use, if possible,
full cones.

2

Blast tube

Regulating rod

Shutter

Terminal plane of the blast tube

D5398

2

1

3

5

3

Summary of Contents for G10 LC

Page 1: ...20013654 2 05 2009 Installation use and maintenance instructions Light oil burner CODE MODEL TYPE 20013617 G10 LC 464T1 GB CN One stage operation...

Page 2: ...safety start up use and maintenance of the burner DELIVERY OF THE SYSTEM AND THE INSTRUCTION MAN UAL When the system is delivered it is important that The instruction manual is supplied to the user b...

Page 3: ...ly Single phase 230V 10 50Hz Motor Run current 0 8A 2850 rpm 298 rad s Capacitor 4 F Ignition transformer Secondary 8 kV 16 mA Pump Pressure 7 15 bar Absorbed electrical power 0 170 kW 1 Return line 2...

Page 4: ...9 83 83 170 4 5 105 It is necessary that the insulating gasket 9 fig 1 is placed between the boiler door and the burner flange This insulating gasket has six holes which if necessary can be modified a...

Page 5: ...valve PRIMING THE PUMP Start the burner and wait for the priming Should lock out occur prior to the arrival of the fuel await at least 20 seconds before repeating the operation A filter must be instal...

Page 6: ...neath the ignition transformer on a plug in support TESTING Check the shut down of the burner by opening the thermostats ATTENTION Do not connect burner s grounding to failure indicator terminal This...

Page 7: ...n fitting the nozzle with the blast tube removed It depends on the output of the burner and is carried out by rotating the reg ulating rod till the terminal plane of the blast tube is level with the s...

Page 8: ...per 1 after loosing the screws 2 When the optimal regulation is reached screw tight the screws 2 The settings indicated in the schedule are purely indicative Each installation however has its own unpr...

Page 9: ...ion head one set point further ahead than indicated in the instructions Example the instructions require to set the combustion head on set point 3 Instead the setting is made on set point 4 4 FAN AIR...

Page 10: ...20013654 CN Technical Assistance Centre Assistance Centre Maintenance Contract...

Page 11: ...C 2004 108 EC 73 23 EEC 2006 95 EC 98 37 EEC 92 42 EEC O IP 40 EN 60529 464T1 54 120 kW 4 5 10 kg h 20 C 4 6 mm2 s 230V 10 50Hz 0 8A 2850 rpm 298 rad s 4 F 8 kV 16 mA 7 15 bar 0 170 kW 1 2 3 4 5 6 7 8...

Page 12: ...20013654 2 CN EN 267 0 8 0 0 4 4 5 6 kg h 50 60 120 kW D5669 70 80 90 100 110 0 2 0 6 mbar 7 8 9 10 305 108 261 140 40 4 5 262 1 1 204 D5670 189 83 83 170 4 5 105 9 1 6 D5242 2 2 D5572 S7385...

Page 13: ...Hg 20 H m L m I D 8 mm I D 10 mm 0 5 1 1 5 2 10 20 40 60 20 40 80 100 A A H m L m I D 8 mm I D 10 mm 0 0 5 1 1 5 2 3 3 5 35 30 25 20 15 8 6 100 100 100 90 70 30 20 H max 4 m H H max 4 m min 0 1 m D521...

Page 14: ...20013654 4 CN 50V T6A N L M S7026 1 mm2 A 230V 50Hz N L 230V 0 5A max 1 2 3 4 5 6 7 8 9 530SE T T 1 N 2 L 3 A 3 2 1 D5228...

Page 15: ...B Steinen S Q Danfoss S 12 bar 12 bar 14 bar 12 bar 1 50 GPH 3 6 mm 2 1 3 P 6 GPH bar kg h 4 1 10 60 12 4 4 2 3 1 25 60 12 5 0 2 5 3 4 1 50 60 12 6 0 3 3 8 1 75 60 12 7 0 4 4 2 00 60 12 8 0 5 5 2 25...

Page 16: ...20013654 6 CN CO2 CO2 1 3 3 4 2 1 2 5 9kg h D7178 1 2 D5231 1 2 3 6 D5671 3 4 5 4...

Page 17: ...7 20013654 CN 6 5 C 1 6 2 12 bar 5 C 14 bar 3 3 4 4 1 A 4 0 3 mm D5288 A 4 5 0 5 mm 6 12s D5229 12s 5s...