INSTALLER
33
B
A
B
A
r
TAU UNIT
boilers must be connected to the meth-
ane or LPG gas supply in compliance with the relevant
standards.
Perform the following checks before making the con-
nection:
- Check that the boiler is compatible with the type of gas
supply
- Check that the gas supply pipes have been thoroughly
cleaned.
A filter of suitable particle rating should be installed.
TAU 55 UNIT TAU 75 UNIT TAU 110 UNIT
A
1402
1505
1639
B
141,5
141,5
79
Gas fitting
Ø 1/2” M
Ø 1/2” M
Ø 3/4” M
TAU 55 - 75 UNIT
TAU 110 UNIT
GAS CONNECTION
b
The gas feed line must be suitable for the flow rate
demanded by the burner. The gas feed system
must also be equipped with all the necessary safety
and control devices required by applicable legisla-
tion and standards.
b
On completion of the installation, check that all
joints are sealed.