![Riello UPS MASTER HP-UL 100-00 User Manual Download Page 11](http://html.mh-extra.com/html/riello-ups/master-hp-ul-100-00/master-hp-ul-100-00_user-manual_1460281011.webp)
Pag. 11 a 83
0MLMHTK65RUENUB
Preliminary operations
Removing the packaging and positioning the device
On delivery, the packaging must be inspected to ensure that it is whole and that it has not been crushed or dented.
Check in particular that neither of the two impact resistant devices on the packaging is red; if one of them is red;
follow the instructions on the packaging.
The essential details of the device are provided on the shipping document. The marking, weight and dimensions of
the various items making up the packing list are shown.
Check the state of the device by means of a visual inspection of both the inside and the outside. Any dents seen
mean that it has suffered shocks during shipping, which could compromise the normal operation of the device.
During inspection, you may notice that a flat cable is left unconnected from one of the Circuit Cards on the back of
the inner front door. The reason for this is as follows: The UPS is supplied with the paralleling controls as standard,
but the UPS is shipped with this feature disabled. Disablement is due to one end of a flat cable being left
unconnected. One end of this cable connects to J2 of the System Card (a printed wiring board assembly with
"2032" in the part number). The end that is left unconnected needs to be connected to J3 on the paralleling Card
("2034" in the part number) if parallel operation is desired. If this cable is connected, the UPS will not operate
without the modular cables connected between the UPS units that are to be paralleled. That is, DO NOT connect
this cable for standalone (non-parallel) operation.
Storage
In the following situations:
-
installation not immediately after delivery;
-
de-installation and storage while awaiting relocation,
Place the device in covered premises that are protected from direct contact with atmospheric agents and dust. The
following environmental values are those allowed in the storage area:
Temperature:
-13°F
to
+167°F (
-25 to + 75 °C)
Relative humidity:
30-95 % max.
For the installation of a battery cabinet, if provided with the uninterruptible power supply, follow the
instructions given in the specific manual.
The list of material provided may vary depending on the order specifications. As a general rule, the packaging
should include the following: this manual, the installation drawing, the warranty and eventual accessories.
Handling
The equipment must only be handled by adequately trained personnel. It can be unloaded from the vehicle and put
into place by lifting the box or the wooden deck to which the equipment is secured with a fork-lift truck. A fork-lift
truck should be used for the permanent positioning of the equipment, in accordance with the instructions provided
below.
1
Insert the forks of the fork-lift truck in the lower part of the device, from the front or back, and ensure
that they stick out about 12 inches on the other side.
2
Secure the device to the fork-lift before moving it.