1-7 Installation Steps:
This section provides a brief overview of how to get started using the SunWide controller.
However, please review the entire manual to ensure best performance and years of
trouble-free service.
NOTES:
z
The SunWide prevents reverse current leakage at night, so a blocking diode is not
required in the system.
z
The connector terminals will accept a maximum wire size of AWG #10 (up to 5.2
mm
2
). A flathead screwdriver is required. (Some #10 spade connectors may not fit in
this terminal.)
z
Tighten each terminal clamping screw to 20 inch-pounds of torque.
z
The SunWide is designed to regulate power from a PV array. Other generators can
be connected directly to the battery, however, with no effect on the SunWide.
STEPS:
1. Mount the SunWide on to a vertical surface. Allow a minimum of 5 cm (2 inches)
space above and below the controller for air flow.
2. Make sure the PV and load currents will not exceed the ratings of the SunWide model
being installed.
3. The connections to the SunWide terminals are shown in the panel drawing.
SunWide
SW-30CL
CHARGE
LOAD
BULK
EQUAL
FLOAT
FAULT
FAULT
ON
LVR
LVD
LIGHT
TEST
MANUAL
EQU/LVR
BVS
BTS
Remote
Panel
LIGHTING
CONTROL
OFF 2
4
6
8
10
2/1
3/1
4/1
6/1
2/2
3/2
4/2
6/2
8/2
D/D
SOLAR
BATTERY
LOAD
Normal Voltages
12V -24VDC
R
ABSOR
4. Connect the
BATTERY
first. Be careful that bare wires do not touch the metal case of
the controller.
※
The BATTERY must be connected before the SOLAR to properly start the
microcontroller.
※
If the battery voltage is below LVD (low voltage disconnect) which can be selected by
MANUAL EQU/LVR and LIGHT TEST buttons, the load has been automatically
disconnected due to a very low battery charge condition, and the battery must be
recharged.
※
A battery below 10 volts may not start the microcontroller properly. Make sure the
battery is charged before installing the system.
5. Connect the
SOLAR
(PV array) next. The green LED indicator will light if the array is