![Rice Lake Tracer AV Installation Manual Download Page 9](http://html1.mh-extra.com/html/rice-lake/tracer-av/tracer-av_installation-manual_1453992009.webp)
Installation
© Rice Lake Weighing Systems
●
All Rights Reserved
5
Figure 2-2. Tracer AV (back) Security Cables Installed After NTEP Certification
2.3 Cable Connections
The Tracer AV provides several cable connections: one for the power cord, one to accommodate the load cell, communications,
shows the assignments for the Tracer AV connections. Details on pin assignments
on page 9
through
Table 2-5 on page 10
.
Figure 2-3. Tracer AV Power Cord Connection, DB-9 Connections and Setup Switch Access Screw
Power Cord Connection
DB-9 Connections
Remove Screw to
Access Setup Switch