![Rice Lake RL1200 Installation & Operation Manual Download Page 21](http://html1.mh-extra.com/html/rice-lake/rl1200/rl1200_installation-and-operation-manual_1454209021.webp)
Mechanical to Electronic Installation Instructions
©
Rice Lake Weighing Systems
●
All Rights Reserved
17
4. Place the indicator base plate on pillar aligning the pillar rods through the base plate holes and handles facing the
back of the scale.
Figure 4-3. Mount Base Plate to Pillar and Attach Steelyard Hook
5. Hook the steelyard hook through the eye-bolt as shown in
.
6. Push the load cell cable inside pillar leaving enough slack inside pillar and draw the cable end up through hole in the
base plate.
Figure 4-4. Run Load Cell Cable Through Base Plate and Tighten Base Plate to Pillar
7. Tighten the indicator base plate to the pillar by using lock washers and acorn nuts as shown in
8. Run load cell cable through the tilt stand on the indicator.
Figure 4-5. Run Load Cell Cable Through Bottom of Indicator Tilt Stand
Pillar rods
Attach the steelyard hook
through eye-bolt