![Rice Lake RL1200 Installation & Operation Manual Download Page 13](http://html1.mh-extra.com/html/rice-lake/rl1200/rl1200_installation-and-operation-manual_1454209013.webp)
Installation
©
Rice Lake Weighing Systems
●
All Rights Reserved
9
3. To put the connecting steelyard rod into position inside the pillar, raise the long lever under the scale base and hook
the lower end of the rod with loop in the nose iron assembly.
Figure 2-9. Attach Hook to Nose Iron Assembly
4. Temporarily hang the steelyard rod on the cutout in the pillar as shown.
Figure 2-10. Steelyard Hook on Pillar Cutout
IMPORTANT:
If assembling the Mechanical to Electronic version of the RL1200, please proceed to
for further assembly instructions.
5. Place the weight rack on top of the pillar with the hook facing as shown.
Figure 2-11. Place Weight Rack on Pillar
Hook loop onto the
nose iron assembly
under scale base
Hook and
steelyard hook
should both
face as shown.