![Rice Lake RL1200 Installation & Operation Manual Download Page 20](http://html1.mh-extra.com/html/rice-lake/rl1200/rl1200_installation-and-operation-manual_1454209020.webp)
RL1200 Portable Beam Scale
16
Visit our website
4.2 Indicator and Load Cell Installation
Use the following steps to attach the indicator and load cell to the RL1200.
1. Take the indicator base plate and lay it on its side.
2. Note the orientation of the load cell. Put the 3.5 inch bolt through the long bolt washer and through the top of the
indicator base plate. Thread on the locknut to the bottom of the bolt.
Figure 4-1. Set Indicator Base Plate on Side and Attach Load Cell
3. Screw the eye bolt and locknut into the bottom of the load cell until flush. Tighten the locknut.
Figure 4-2. Screw Eye-Bolt Into Load Cell
Locknuts
2
Long bolt
1
Long bolt washer
1
Item Description
Quantity
Table 4-1. Conversion Kits Parts List