MAINTENANCE
SE6 05/05
Maintenance Section 5-6
© 2005 Alamo Group Inc.
MAINTENANCE
Use only original equipment blades on this cutter. They are made of special heat-treated alloy
steel. Substitute blades may not meet specifications and may fail in a hazardous manner that
could cause injury.
BLADE SHARPENING
IMPORTANT!
When sharpening blades, grind each blade the same amount to maintain balance. Follow
original sharpening pattern as shown in
Figure Mnt-R-0008.
Always sharpen blades by grinding. Always
sharpen both blades at same time to maintain balance. The difference in blade weights should not exceed 1
ounce. Unbalanced blades will cause excessive vibration which can damage gear box bearings. Vibration
may also cause structural cracks in cutter housing. DO NOT heat and pound out edge. Do not sharpen blade
to a razor edge, but leave a 1/16" blunt edge. Do not sharpen back side of blade.
Avoid personal injury. Always block the cutter up to prevent if from falling when the blades and/ or
carrier are being serviced.
BLADE CARRIER REMOVAL/INSTALLATION
Avoid personal injury. Blade and/or blade carrier removal should be done only with the tractor
engine shut off, key removed, in neutral, parking brake on, and PTO disengaged and the cutter
blocked in the raised position.
Replace bent or broken blade with new blades. NEVER ATTEMPT TO STRAIGHTEN OR WELD
ON BLADES SINCE THIS WILL LIKELY CRACK OR OTHERWISE DAMAGE THE BLADE
WITH SUBSEQUENT FAILURE AND POSSIBLE SERIOUS INJURY FROM THROWN BLADES.
(SGM-10)
Summary of Contents for FC-0007
Page 7: ...Safety Section 1 1 2005 Alamo Group Inc SAFETY SECTION...
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ...Introduction Section 2 1 2005 Alamo Group Inc INTRODUCTION SECTION...
Page 81: ...Assembly Section 3 1 2005 Alamo Group Inc ASSEMBLY SECTION...
Page 92: ......
Page 93: ...Operation Section 4 1 2005 Alamo Group Inc OPERATION SECTION...
Page 136: ......
Page 137: ...Maintenance Section 5 1 2005 Alamo Group Inc MAINTENANCE SECTION...
Page 154: ...SE 6 OM 05 05 P N 00768614C Printed U S A SE 6 ROTARY MOWER...
Page 157: ......
Page 159: ......