background image

Cino XS grande PRO VHO 

by 

MAN2100154 rel. 00 dated 04.11.2013                                                                               page no.  42 of 51 pages 

 

www.rheavendors.com     tel: 0039 02 966 551     fax: 0039 02 96 55 086     e mail: [email protected] 

exclusive property of rheavendors group 

OFF   2 

 

 

 

OFF   2 E 

OFF  2 M 

OFF   2 P  

 

 

OFF   3 

 

 

 

 

OFF   5 

 

 

OFF   6 

 

OFF   6 C                             

 

 

 

 

OFF   6 D 

 

 

 

OFF   6 G 

 

 

 

 

 

 

OFF   7 

 

OFF   7 A 

 

 

 

 

 

 

OFF   8 

 

 

 

 

OFF   8 A 

 

 

OFF   8 B 

 

 

OFF   8 C 

 

OFF   8 D 

 

OFF   8 E 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

payment system 

 

protocol 

 

executive 

MDB 

parallel 

 

 

drip tray 

 

 

 

 

EAROM 

 

 

water supply 

 

air break 

 

 

 

 

air break 

 

 

 

pressure boiler 

 

 

 

 

 

 

espresso circuit 

 

espresso pump 

 

 

 

 

 

 

coffee brewer 

 

 

 

 

piston 

 

 

presence 

 

 

piston            

 

piston 

 

piston 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

no communication between the payment system and the vending machine 

CPU; it might be caused by improper power supply, false programming or 

payment system malfunction; 

 

 

the sensor controlling the liquid level in the drip tray has tripped; empty it 

and re-position it; 

 

 

 

those integrated in the CPU board fail to operate properly; 

 

 

 

 

the water supply might be totally lacking, its pressure might be not enough 

or  some  obstacle  might  slow  down  the  regular  water  flow  (filter  grilled 

cover, load pipes either choked or clogged); the water inlet solenoid valve 

safety has tripped; 

 

the  pressure  boiler  circuit  has  been  refilled  with  water,  but  no  drink  has 

been dispensed; the supply circuit might have a leakage; 

 

 

during  the  first  installation  phase,  water  inlet  error  in  the  machine;  after 

having opened the water inlet solenoid valve and activated the pump, the 

volumetric  counter  shall  send  the  CPU  a  sequence  of  pulses  to  give 

evidence that water is flowing; if this does not occur, error 6G is triggered; 

 

 

 

 

 

the power-on time of the espresso circuit pump has exceeded the limit; the 

water  flow  has  encountered  more  resistance  than  usual  and  the  pulses 

produced by the volumetric counter have required a time interval deemed 

to  be  too  long  for  a  dispensing  cycle  within  proper  limits;  also  check  the 

grinding amount and degree of coffee beans poured into the coffee brewer 

chamber; 

 

 

 

 

 

 

error in the lower piston movement down or in the upper piston movement 

up; 

 

the  machine  fails  to  recognise  the  presence  of  the  coffee  brewer  in  its 

correct working position; 

 

the upper piston is not moving properly; 

 

the lower piston is not moving up properly to the chamber; 

 

the lower piston is not moving down properly; 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

Summary of Contents for Cino XS Grande Pro VHO

Page 1: ...XS GRANDE PRO VHO type compact __________________________________________ www rheavendors com INSTALLATION AND MAINTENANCE MANUAL Translation of the original instructions MAN2100154 rel 00 dated 04 11...

Page 2: ...make sure they are operating on totally safe conditions the use of the service key shall be strictly limited to the time necessary to perform the actions requiring the use thereof users shall be infor...

Page 3: ...eavendors rheavendors com exclusive property of rheavendors group the symbol means that it is forbidden to dispose of the equipment as urban waste and compulsory to provide for separate collection in...

Page 4: ...and utilisation product powder bags never repair or carry out any technical action if you have not been properly trained signal that a technical action is in progress on the machine barriers against a...

Page 5: ...r the same or an equivalent one the guarantee of the new machine will be extended up to the original term of guarantee of the replaced machine all the parts that should prove to be defective due to ne...

Page 6: ...ety standards Directives 2004 108 EC 2006 95 EC 2006 42EC 2002 95 EC RoHS 2002 96 EC RAEE 1907 2006 EC REACH 1935 2004 EC Standards SAFETY EN 60335 1 2002 A11 2004 A1 2004 A12 2006 A2 2006 A13 2008 A1...

Page 7: ...ding machine in its hardware and software components for a complete and fully aware use of all machine functions due to the large variety of available options and the constant technical update of our...

Page 8: ...ument may be protected by Rheavendors Industries S p A according to the Law this manual is intended for the vending machine owner it is an integral part of the machine and it must be kept with the mac...

Page 9: ...relief valve water inlet solenoid valve with antiflood sensor a main switch a door switch two fuses 6 3x32 mm manually resettable sensors time limits for water dispensing A weighted sound pressure lev...

Page 10: ...of the machine Cino XS grande PRO VHO are water total hardness recommended conductivity in case of higher hardness use anti limestone filters and provide for their regular maintenance according to the...

Page 11: ...O vending machines Rheavendors Industries S p A offers a series of accessories manufactured for these machines such as base cabinets autonomous water supply kits payment systems Rheavendors Services S...

Page 12: ...05 22 variable coffee brewer 05 06 drip tray 05 19 coffee beans canister 05 26 mixing bowl 05 27 nozzle holder 05 06 level sensors 05 19 instant product canisters 05 13 door switch 05 28 product moto...

Page 13: ...ction 05 10 fuses 05 09 power on switch 05 35 outlet solenoid valve 05 12 water inlet solenoid valve 05 30 powder aspirator 05 28 product motor 05 37 CPU 05 20 product sensor 05 21 grinder motor 05 32...

Page 14: ...functions thus enabling the operator to modify the machine parameters the numbering of keys is progressive from the top and from the left 1 2 display messages inform users or operators about the opera...

Page 15: ...ide the door panel it can be removed to facilitate cleaning a flap support for dispensing into small cups is hinged in the front instant product canisters dispense their content into the underlying mi...

Page 16: ...ed with lukewarm running water a fixed support at the cup station accommodates the dispensers from the mixing bowls of mixers and the one of hot water for cups the slide installed nozzle support can b...

Page 17: ...protection clicsons a solenoid valve is used to empty the water circuit see 13 19 the static relay arranged inside the vending machine behind the supply bock can directly supply the pressure boiler h...

Page 18: ...atus the display board secured inside the door receives the signals from the selection keyboard consisting of two separate modules of five keys each and it displays the messages produced by the CPU it...

Page 19: ...to update one of the software programmes above on the machine the flash key may be of great use the key can contain either software or both of them and provide for a rapid and safe transfer please not...

Page 20: ...the reach of unauthorised personnel in particular of children since they are a potential source of danger the disposal of package components may be carried out by specialised companies only the vendin...

Page 21: ...b close to the vending machine remove the drawer c arrange the 4 spacers d on the tabletop base b slightly tilt the vending machine unscrew the feet e one by one and rotate them counterclockwise lift...

Page 22: ...with the machine or in case of replacement use tubes featured as above only for the drinkability features of waters intended for human consumption refer to the following Internet address http eur lex...

Page 23: ...t to open the blade of the coffee beans canister c attention put a cup beneath the nozzles insert and rotate the service key a into the door switch see 05 13 attention act with the utmost caution the...

Page 24: ...power off the vending machine by means of the service key put it into its support see 05 13 power off the main switch at the back of the machine see 05 09 prepare a chlorine based anti bacterial sanit...

Page 25: ...per hatch attention in this operation mode the vending machine is supplied and operating to all effects act with the utmost caution press key PROG inside the front hatch from now on the selection keyb...

Page 26: ...e 09 01 n product qty 09 01 o maintenance 09 01 p rfid card 09 01 q tuning motor 09 01 r id machine 09 01 s var brewer the items are scroll by pressing key 1 it contains the variables composing select...

Page 27: ...ed drink consisting of instant products only coffee will be dispensed before value 1 or after value 0 instant products it establishes the re opening value of the coffee brewer chamber after compressin...

Page 28: ...econd milk and the espresso dispensing cycle it establishes the milk quantity of the second dispensing cycle it determines the delay of the second milk dispensing cycle it determines the interruptions...

Page 29: ...fn use 4 and 5 to vary the amount and 2 to scroll the price lines for the parallel payment system assign each channel its value press 2 to scroll the coins from A to J and use 4 and 5 to change the v...

Page 30: ...tion used to make sure that the water circuit is filled up at the next power on if the value is zero the machine will perform the cycle like in 08 02 at the next power on to empty the pressure boiler...

Page 31: ...quantity of the vends made after the reset VA 101 total amount of receipts parameter not resettable VA 103 total amount of receipts after the reset VA 202 quantity of total tests parameter not resetta...

Page 32: ...nt maximum change to determine the maximum change amount single multiple vend to keep the residual credit amount after a dispensing cycle or not token value to quantify the value of the token coins ch...

Page 33: ...h the machine operation you may also decide whether to inhibit or not the dispensing cycle of the selections including that product as soon as the time credit is used up after filling the canister the...

Page 34: ...mber machine configuration address for connection with the DDCMP protocol 0 for audit via telemetry option 1 to enable the IRDA detection 2 to disable the detection to set the diameter of the coffee b...

Page 35: ...ntains all the parameters typical of the machine from which they have been fetched If you wish to programme another vending machine with these data the previous procedure can be repeated by pressing k...

Page 36: ...EEP TIME START DELAY MIXER LM DECIMAL NUMBER MIXER LM SPEED LANGUAGE PRODUCT MILK LM DISPLAY COLOR LM MILK WATER NUMBER FIRST INSTALLATION JUG DEINSTALLATION SELECTION NAME ENERGY SAVE EMS SUMMER TIME...

Page 37: ...EE GROUNDS RFID CARD MAX CREDIT CARD COIN N WITH CARD COIN N NO CARD TUNING MOTORS TUNING MOTOR TUNING GRINDER ID MACHINE CODE ID 101 CODE ID 104 CODE ID 106 ADDRESS VITDTS DATA AUDIT VAR BREWER DIAME...

Page 38: ...mixer del mixer 10 Varmt vann water 3 180 Cino XS grande PRO VHO by MAN2100154 rel 00 dated 04 11 2013 page no 38 of 51 pages www rheavendors com tel 0039 02 966 551 fax 0039 02 96 55 086 e mail rhea...

Page 39: ...milk 1st delay 2nd milk 2nd delay time 10 02 LM selection Cino XS grande PRO VHO can produce a drink called Latte Macchiato composed by milk and coffee and served in the cup in differently coloured ba...

Page 40: ...iler temperature C 0 120 pressure boiler temperature in energy saving C 0 120 heater temperature C 0 50 heater temperature in energy saving C 0 50 product decounter sec 0 6 000 0 no limit jug n 0 10 s...

Page 41: ...ices assemblies and functions in question in the following table the first column shows the machine number any variant is shown with the detail letters for more specification the second shows the mach...

Page 42: ...grilled cover load pipes either choked or clogged the water inlet solenoid valve safety has tripped the pressure boiler circuit has been refilled with water but no drink has been dispensed the supply...

Page 43: ...ater quantity the error is more likely to occur the programming keyboard inside the machine has a short circuited key or it has been pressed too long if pressed too long the manual release button of c...

Page 44: ...hine listed here below use plenty of lukewarm water to remove any residue that might build up the support of a bacterial static or bactericidal solution may strengthen a deep cleaning action provided...

Page 45: ...turn the baffles of the product slides c to close them remove them from canisters and wash them with plenty of lukewarm water product slides are plugged in turn the fastening levers of mixing bowls d...

Page 46: ...sh them with plenty of lukewarm water as it is described by chapter 12 01 weekly at the back of the product canister turn the black ring nut clockwise and remove it extract the worm screw by pulling t...

Page 47: ...o outlet water circuits check the third way of the espresso valve drain by removing any trace of residue v empty and clean the air break tank z carefully check the micro switch functionality operated...

Page 48: ...n a vending machine installed in a room where the temperature is as prescribed 5 C 35 C the grinding degree of the coffee beans fundamentally established by the distance between the grinding wheels ca...

Page 49: ...the two small electric cables from the motor hold the body push it to the bottom to release it from the bayonet connection of the structure the power supply wires can be removed without any tool obse...

Page 50: ...is off detach the water supply disassemble the rear panel connect a 6x9 tube with the solenoid valve intended to discharge the pressure boiler see 05 35 and convey water into a min 3 l bucket to be p...

Page 51: ...04 06T silicone hose 04 06T symbol T1 T2 T3 T4 T5 T6 T7 column name coffee brewer mixer 1 mixer 2 nozzle support drip tray 90 joint short insert symbol GC M1 M2 ER VRG IN9 IFC column 8B 10B 11B 11D 11...

Reviews: