Rheavendors Group Cino XS Grande Pro VHO Installation And Maintenance Manual Download Page 27

 COFFEE WATER 

 0= INHIB.       cc: 00 

 COFFEE SEQUENCE 

 1=COF. BEFORE     N 

 FUNCTIONING 

    

 INHIBITED 

   

 PROGRAMMING: 

 TOTAL 

 PROGRAMMING: 

 PARTIAL 

 PRODUCT N 

 0= INHIB.           0.0 

 STEP DOWN BREWER 

 mm:  

00 

 GRINDER TIME 

                          0.0 

 T. AFTER PREINF. 

 0=NO      SEC .   00 

 WATER N  TIME 

 0= INHIB.          0.0 

 START DELAY 

 WATER N            0.0 

 BREAKS NUMBER  

 0-1-2                   00    

 START DELAY  

 PRODUCT  N        0.0 

(*) LATTE MACCHIATO 

    START BREWER    0.0 

(*) PRODUCT LM 

   0=INHIB.              0.0 

se ≠0

 

se ≠0

 

PROGRAMMING 

  BUTTON N 

Cino XS grande PRO VHO 

by 

MAN2100154 rel. 00 dated 04.11.2013                                                                               page no.  27 of 51 pages 

 

www.rheavendors.com     tel: 0039 02 966 551     fax: 0039 02 96 55 086     e mail: rheavendors@rheavendors.com 

exclusive property of rheavendors group 

 

09.01.a.  button 1 ÷ 10 

  

  

  

  

  

  

  

  

  

  

  

    

 

 

when  the  display  shows 

“key

 

n”,

  press  key 

2

  to  scroll  (by 

pressing 

4

 and 

5

”)

 the variables composing the function of that 

key;  

  

- if you press 

2

 when 

“ENABLED”,

 the key will fulfil the  function 

for  which  it  is  programmed  (dispensing  of  one  drink);  see 

paragraph 

“enabled”

 

-  if  you  press 

2

 when 

“NOT

 

ENABLED”,

  the  key will  be  inhibited 

and no function will be fulfilled; 

 

press key 

2

 to scroll the following items: 

  

choose  the 

“extended”

  option  to  display  all  variables;  choose 

"reduced"  to  only  display  the  parameters  with  values  other  than 

zero (press keys 

4

 and 

5

 to vary the option); 

 

 

the  first  programmable  product  for  each  selection  key  is  espresso 

coffee; there are three variables: 

  

-  the water quantity in the cup; change it with 

4

 and 

5

; if the 

variable is zero, no espresso will be dispensed (drink consisting of 

instant products only); 

 

- coffee will be dispensed before (value 1) or after (value 0) instant 

products; 

 

 

- it establishes the re-opening value of the coffee brewer chamber 

after compressing ground coffee and before activating the pump for 

coffee percolation; 

 

 

scroll by pressing 

2

”,

 the display will show: 

 

press  key 

4

  and 

5

  to  vary  the  motor  rotation  time  of  the  N 

product, thus modifying the product quantity dispensed; if the time 

is zero, the N product is not dispensed; you can carry out a "time 

test" on the set-up value; (see 13.17.); 

 

 

if  programmed  with  a  time  other  than  zero,  the  N  product  motor 

will be activated with the delay programmed herein; the delay time 

is increased or decreased by pressing keys 

4

 and 

5

  

the  rotation  time  of  the  product  motor  can  be  briefly  interrupted 

once  or  twice  during  the  dispensing  cycle  (0  =  no  interruption); 

(also see 13.16.); 

 

 

it  establishes  how  long  the  coffee  beans  grinder  motor  will  be 

activated, thus determining the ground quantity that will be poured 

into the coffee brewer; 

 

 

if  this  option  is  enabled,  after  compressing  the  ground  dose,  the 

pump delivers a small water quantity to make it wet, it stops and 

resumes the usual dispensing cycle; 

 

 

it  determines  the  opening  time  of  the  instant  solenoid  valve  and, 

therefore the water quantity dispensed; you can carry out a "time 

test" on the set-up value; (see 13.17.); 

  

the  water  into  the  mixing  bowl  will  be  dispensed  with  the  delay 

programmed herein; 

 

 

(*) the functions concerning the regulation parameters of the "latte 

macchiato" drink are not included in this list since they have been 

grouped into the items: LM dispensing; 

 

 

 

 

 

 

 

 

 

Summary of Contents for Cino XS Grande Pro VHO

Page 1: ...XS GRANDE PRO VHO type compact __________________________________________ www rheavendors com INSTALLATION AND MAINTENANCE MANUAL Translation of the original instructions MAN2100154 rel 00 dated 04 11...

Page 2: ...make sure they are operating on totally safe conditions the use of the service key shall be strictly limited to the time necessary to perform the actions requiring the use thereof users shall be infor...

Page 3: ...eavendors rheavendors com exclusive property of rheavendors group the symbol means that it is forbidden to dispose of the equipment as urban waste and compulsory to provide for separate collection in...

Page 4: ...and utilisation product powder bags never repair or carry out any technical action if you have not been properly trained signal that a technical action is in progress on the machine barriers against a...

Page 5: ...r the same or an equivalent one the guarantee of the new machine will be extended up to the original term of guarantee of the replaced machine all the parts that should prove to be defective due to ne...

Page 6: ...ety standards Directives 2004 108 EC 2006 95 EC 2006 42EC 2002 95 EC RoHS 2002 96 EC RAEE 1907 2006 EC REACH 1935 2004 EC Standards SAFETY EN 60335 1 2002 A11 2004 A1 2004 A12 2006 A2 2006 A13 2008 A1...

Page 7: ...ding machine in its hardware and software components for a complete and fully aware use of all machine functions due to the large variety of available options and the constant technical update of our...

Page 8: ...ument may be protected by Rheavendors Industries S p A according to the Law this manual is intended for the vending machine owner it is an integral part of the machine and it must be kept with the mac...

Page 9: ...relief valve water inlet solenoid valve with antiflood sensor a main switch a door switch two fuses 6 3x32 mm manually resettable sensors time limits for water dispensing A weighted sound pressure lev...

Page 10: ...of the machine Cino XS grande PRO VHO are water total hardness recommended conductivity in case of higher hardness use anti limestone filters and provide for their regular maintenance according to the...

Page 11: ...O vending machines Rheavendors Industries S p A offers a series of accessories manufactured for these machines such as base cabinets autonomous water supply kits payment systems Rheavendors Services S...

Page 12: ...05 22 variable coffee brewer 05 06 drip tray 05 19 coffee beans canister 05 26 mixing bowl 05 27 nozzle holder 05 06 level sensors 05 19 instant product canisters 05 13 door switch 05 28 product moto...

Page 13: ...ction 05 10 fuses 05 09 power on switch 05 35 outlet solenoid valve 05 12 water inlet solenoid valve 05 30 powder aspirator 05 28 product motor 05 37 CPU 05 20 product sensor 05 21 grinder motor 05 32...

Page 14: ...functions thus enabling the operator to modify the machine parameters the numbering of keys is progressive from the top and from the left 1 2 display messages inform users or operators about the opera...

Page 15: ...ide the door panel it can be removed to facilitate cleaning a flap support for dispensing into small cups is hinged in the front instant product canisters dispense their content into the underlying mi...

Page 16: ...ed with lukewarm running water a fixed support at the cup station accommodates the dispensers from the mixing bowls of mixers and the one of hot water for cups the slide installed nozzle support can b...

Page 17: ...protection clicsons a solenoid valve is used to empty the water circuit see 13 19 the static relay arranged inside the vending machine behind the supply bock can directly supply the pressure boiler h...

Page 18: ...atus the display board secured inside the door receives the signals from the selection keyboard consisting of two separate modules of five keys each and it displays the messages produced by the CPU it...

Page 19: ...to update one of the software programmes above on the machine the flash key may be of great use the key can contain either software or both of them and provide for a rapid and safe transfer please not...

Page 20: ...the reach of unauthorised personnel in particular of children since they are a potential source of danger the disposal of package components may be carried out by specialised companies only the vendin...

Page 21: ...b close to the vending machine remove the drawer c arrange the 4 spacers d on the tabletop base b slightly tilt the vending machine unscrew the feet e one by one and rotate them counterclockwise lift...

Page 22: ...with the machine or in case of replacement use tubes featured as above only for the drinkability features of waters intended for human consumption refer to the following Internet address http eur lex...

Page 23: ...t to open the blade of the coffee beans canister c attention put a cup beneath the nozzles insert and rotate the service key a into the door switch see 05 13 attention act with the utmost caution the...

Page 24: ...power off the vending machine by means of the service key put it into its support see 05 13 power off the main switch at the back of the machine see 05 09 prepare a chlorine based anti bacterial sanit...

Page 25: ...per hatch attention in this operation mode the vending machine is supplied and operating to all effects act with the utmost caution press key PROG inside the front hatch from now on the selection keyb...

Page 26: ...e 09 01 n product qty 09 01 o maintenance 09 01 p rfid card 09 01 q tuning motor 09 01 r id machine 09 01 s var brewer the items are scroll by pressing key 1 it contains the variables composing select...

Page 27: ...ed drink consisting of instant products only coffee will be dispensed before value 1 or after value 0 instant products it establishes the re opening value of the coffee brewer chamber after compressin...

Page 28: ...econd milk and the espresso dispensing cycle it establishes the milk quantity of the second dispensing cycle it determines the delay of the second milk dispensing cycle it determines the interruptions...

Page 29: ...fn use 4 and 5 to vary the amount and 2 to scroll the price lines for the parallel payment system assign each channel its value press 2 to scroll the coins from A to J and use 4 and 5 to change the v...

Page 30: ...tion used to make sure that the water circuit is filled up at the next power on if the value is zero the machine will perform the cycle like in 08 02 at the next power on to empty the pressure boiler...

Page 31: ...quantity of the vends made after the reset VA 101 total amount of receipts parameter not resettable VA 103 total amount of receipts after the reset VA 202 quantity of total tests parameter not resetta...

Page 32: ...nt maximum change to determine the maximum change amount single multiple vend to keep the residual credit amount after a dispensing cycle or not token value to quantify the value of the token coins ch...

Page 33: ...h the machine operation you may also decide whether to inhibit or not the dispensing cycle of the selections including that product as soon as the time credit is used up after filling the canister the...

Page 34: ...mber machine configuration address for connection with the DDCMP protocol 0 for audit via telemetry option 1 to enable the IRDA detection 2 to disable the detection to set the diameter of the coffee b...

Page 35: ...ntains all the parameters typical of the machine from which they have been fetched If you wish to programme another vending machine with these data the previous procedure can be repeated by pressing k...

Page 36: ...EEP TIME START DELAY MIXER LM DECIMAL NUMBER MIXER LM SPEED LANGUAGE PRODUCT MILK LM DISPLAY COLOR LM MILK WATER NUMBER FIRST INSTALLATION JUG DEINSTALLATION SELECTION NAME ENERGY SAVE EMS SUMMER TIME...

Page 37: ...EE GROUNDS RFID CARD MAX CREDIT CARD COIN N WITH CARD COIN N NO CARD TUNING MOTORS TUNING MOTOR TUNING GRINDER ID MACHINE CODE ID 101 CODE ID 104 CODE ID 106 ADDRESS VITDTS DATA AUDIT VAR BREWER DIAME...

Page 38: ...mixer del mixer 10 Varmt vann water 3 180 Cino XS grande PRO VHO by MAN2100154 rel 00 dated 04 11 2013 page no 38 of 51 pages www rheavendors com tel 0039 02 966 551 fax 0039 02 96 55 086 e mail rhea...

Page 39: ...milk 1st delay 2nd milk 2nd delay time 10 02 LM selection Cino XS grande PRO VHO can produce a drink called Latte Macchiato composed by milk and coffee and served in the cup in differently coloured ba...

Page 40: ...iler temperature C 0 120 pressure boiler temperature in energy saving C 0 120 heater temperature C 0 50 heater temperature in energy saving C 0 50 product decounter sec 0 6 000 0 no limit jug n 0 10 s...

Page 41: ...ices assemblies and functions in question in the following table the first column shows the machine number any variant is shown with the detail letters for more specification the second shows the mach...

Page 42: ...grilled cover load pipes either choked or clogged the water inlet solenoid valve safety has tripped the pressure boiler circuit has been refilled with water but no drink has been dispensed the supply...

Page 43: ...ater quantity the error is more likely to occur the programming keyboard inside the machine has a short circuited key or it has been pressed too long if pressed too long the manual release button of c...

Page 44: ...hine listed here below use plenty of lukewarm water to remove any residue that might build up the support of a bacterial static or bactericidal solution may strengthen a deep cleaning action provided...

Page 45: ...turn the baffles of the product slides c to close them remove them from canisters and wash them with plenty of lukewarm water product slides are plugged in turn the fastening levers of mixing bowls d...

Page 46: ...sh them with plenty of lukewarm water as it is described by chapter 12 01 weekly at the back of the product canister turn the black ring nut clockwise and remove it extract the worm screw by pulling t...

Page 47: ...o outlet water circuits check the third way of the espresso valve drain by removing any trace of residue v empty and clean the air break tank z carefully check the micro switch functionality operated...

Page 48: ...n a vending machine installed in a room where the temperature is as prescribed 5 C 35 C the grinding degree of the coffee beans fundamentally established by the distance between the grinding wheels ca...

Page 49: ...the two small electric cables from the motor hold the body push it to the bottom to release it from the bayonet connection of the structure the power supply wires can be removed without any tool obse...

Page 50: ...is off detach the water supply disassemble the rear panel connect a 6x9 tube with the solenoid valve intended to discharge the pressure boiler see 05 35 and convey water into a min 3 l bucket to be p...

Page 51: ...04 06T silicone hose 04 06T symbol T1 T2 T3 T4 T5 T6 T7 column name coffee brewer mixer 1 mixer 2 nozzle support drip tray 90 joint short insert symbol GC M1 M2 ER VRG IN9 IFC column 8B 10B 11B 11D 11...

Reviews: