Radio Frequency Systems
BD4200W Series Air Dryer User’s Guide
Page 88 of 114
100518835 - Rev. B
10.2 Six Month Maintenance
MODEL:
LOCATION NAME:
SERIAL NUMBER:
ADDRESS:
DATE INSTALLED:
Maintenance Interval (Months)
Procedure
Section
6
12
18
24
30
Install Six Month Maintenance Kit
Read & Record Flow Rate (
FLOW
)
Measure & Record Compressor Amp Draw
Measure & Record Incoming Voltage
Test High & Low Outlet Pressure Alarms
9.15 &
Set System Pressure (50 PSI/345 KPa)
Set Static Pressure (20 PSI/138 KPa)
Set Outlet Pressure
Test Consistent Heatless Dryer Cycling
Test Precooler Fan
Test Safety Relief Valve
Test Compressor ON/OFF Cycling
Test Compressor Last Run Time Alarm
Test Humidity Alarm & System Shutdown
Test Air Fittings and Hoses for Leaks
Clean Precooler Coils
Visually Inspect Inside & Outside of Unit for Loose
Wiring or Hardware
Maintenance Performed by:
Date of Maintenance:
NOTE:
COPY OR PRINT THIS PAGE AND KEEP IT WITH THE AIR DRYER
Summary of Contents for BD4200W Series
Page 2: ......