Form I-UDA, P/N 195673 Rev 13, Page 39
Index
A
Abnormal Heat Cycle Functions
25
Aircraft Hangars
4
Control Amps
3
8
Full Load Amps 3
8
APPENDIX
3
8
B
Clean the Burner
31
Burner Maintenance
30
Burner Orifice
32
Burner Removal
30
C
California Warning Label
4
Ceiling Suspension Kit
11
Certification
3
Check installation after startup
2
8
Check the installation prior to startup
27
Check the Lights
35
Chlorine
6
Clearances
7
LED Codes
24, 36
Combustion Air
16
Combustion Air Inlet
3
8
Combustion Air Pressure Switch
34
Combustion Air Proving (Pressure)
Switch
21
Commissioning
27
Confined Space
16
Contact
40
Control Wiring
17
Conversion Kits
13
D
DDC Controls
23
Dimensions
8
Disconnect Switch
35
Door Switch
35
Door Switch - Model UDAS only
22
Downturn Nozzle Kits
7
DSI Integrated Control Module
24, 32
E
Thermal Efficiency
3
8
Electrical Supply
16
F
Continuous Fan Operation
26
Fan/Blower Off Delay 25
Fan/Blower On Delay 25
Fan Blades 33
Fan Motor 22
Fan OFF Delay Settings 24
Fault Modes 26
Field-Installed Parts 6
Flame Rollout Switch
22, 35
Flame Sensor 32
G
Garages
4
Gas Connection
3
8
Gas Connection Size
12
Gas Supply
11
Gas Supply Line
12
Gas Valve
22, 34
Gas Valve ON/OFF Control Knob
2
8
H
Hanger Kits
11
Hanging the Heater
10
HAZARD INTENSITY LEVELS
2
Hazard Labels and Notices
2
Heat Exchanger Maintenance
30
High Altitude Capacity
15
High Altitude Derate
14
High Altitude Kit
6, 7
I
Ignition System 24, 32
Ignition Trial Period 24
Ignitor 32
Input Heating Capacity
3
8
Installation Codes
4
L
Leak-test 12
Lifting 10
LED lights
24
Limit Control
21, 34
Limit Switch
25
Literature Bag 2
9
Location
5
Unit Heater Location
4
Location of Controls
30
Lockout
26
Optional vertical louvers
6
M
Maintenance Procedures
30
Maintenance Schedule
2
9
Massachusetts Requirement
4
Fan Motor 33
Venter Motor 33
Motor HP
3
8
Multiple Heater Control
23
N
Normal Heat Cycle
24
O
Operating Sequence
2
8
Option CC1
6
Option CC2 or CC6
3, 6
Option CD 2, 3, or 4
7
Option CK8, CK10, and CK22
11
Option CL31
23
Option CL32
23
Option CM3
22
Option DJ20 or DJ21
6
Options D10 and D14 23
Orifice Pressure
13
Output Heating Capacity
3
8
P
Plug the unused suspension points 10
Post Purge 25
Power Interruption 26
Preparing for Installation 6
Prepurge 24
Pressure Switch
25
Pressure Switch Settings
21
PRESSURE TESTING SUPPLY PIP
-
ING
11
S
Mounting the Sensor 23
Sound Level
3
8
Spark Gap
32
Startup 27
Stepdown transformer 6
Supply Wiring
17
Suspending 10
Suspending the Heater with Rods
11
Suspend the Heater from 1” Pipe
11
Swivel Connectors
11
T
TECHNICAL DATA
3
8
Thermostat 22
Unit Mounted Thermostat 22
Throw 4
Transformer 35
Troubleshooting 35, 36
Troubleshooting Flowchart
36
TURN OFF GAS TO THE APPLIANCE
2
8
U
Uncrating and Inspecting
6
V
Valve Outlet Pressure
13
Vent 35
Vent/Combustion Air
35
Vent/Combustion Air Kit
3
Vent/combustion air kit
6
Vent cap
6
Vent Connection
3
8
Venter Wheel
33
Venting Manual 3, 5
Vent System Testing Procedure - Model
UDAP 2
8
W
Warranty
4
Weights
10
WHAT TO DO IF YOU SMELL GAS
27
Wiring Connections
17
Wiring Diagram for Model UDAP or
Model UDAS, Single Stage 1
8
Wiring Diagram for Model UDAP or
Model UDAS, Single Stage with
Optional Air Recirculation
1
9
Wiring Diagram for Model UDAP or
Model UDAS, Two Stage Gas Valve
20
Wiring Diagrams
1
8