Reznor, Guardian 1 Phase Electric Heat with Signal Pro, Installation Manual, EN 2021-11, D301375 Iss 0 Page No 15
I
Figure 15.3 Mounting bracket top view
Figure 15.3 shows the dimensions of the
bracket section that is to be fixed to the unit
using 4 x M10 x 30mm 8.8 set screws, 4 x
shake prove washers and 4 x flat washers. Use
the four fixing points supplied in the casing
1. Using the details supplied with the bracket
position the bracket against the wall at the
desired mounting height and mark through
the holes
2. Drill the wall then fix the brackets in
position. Lift the chassis (using lifting gear
if necessary) onto drop rods in the bracket
3. Ensure the unit is level and then tighten
the fixing points with a final check to
ensure the unit is level
4. Follow the instructions 6 to 10 of the drop
rod mounting instructions grill.
Figure 16 Mounting bracket option
Figure 16.1 Mounting bracket fitted to GB
Signal Pro display panel
The display panel can be installed using
the standard double surface box supplied
with the program panel or recessed using a
suitable flush mounted double conduit box.
see “Figure 5.2 Surface mounting back box
dimensions” on page 10 for details
Figure 18 Display panel
The display panel can be connected up to a
maximum of 16 air curtains in one network.
For mains wiring refer to the wiring diagram
on page 17
The display panel is connected to the base
unit in the air curtain via pre-wired RJ45 cable/
plugs. These cables are available in 2, 10, 20,
30, 50 and 100m lengths. It is recommended
that this control cable is run separately within
its own trunking to avoid external interference.
Maximum cable run in any
network must not exceed 100m
in total including program panel
cable.
Note
: All air curtains connected within the
network system will operate under the
settings of the single display panel.