9
GENERAL INSTRUCTIONS
•
The installation of the hot tub must be planned on a case-by-case basis.
•
The manufacturer does not offer detailed ready plans.
•
REXENER hot tub kits are compliant with the EN 17125 standard’s installation method
concerning hot tubs installed on the ground outdoors.
•
The estimated installation time of REXENER hot tub kits is approximately 3 hours.
•
The hot tub should be filled according to the number of users, and considering the maximum
filling volume (ca. 1,500 l).
•
If the heating device (wood stove/REXENER PR200 water heater) is not on use, the water must
be emptied from the heating device.
•
In winter use, it is especially important that there is no water left in the system, as this could
cause damage.
•
The warranty of the manufacturer and importer does not compensate for damage caused by
freezing.
•
The use of an insulation cover speeds up heating and decreases water evaporation on the water
surface.