COMPONENT SETUP
Feb 25/11
9105
8 - 5
COMPONENT PREPARATION
Warning:
Take care when using any electric tooling. Be sure to protect your eyes and
hands when performing any of these procedures. Refer to tool manufacturer’s
manuals on proper use of their equipment before performing any of these
outlined procedures.
Caution:
Do not use any other packing methods than those outlined below.
Packing and Stowage of Handpump and Bailer
Using 1in. wide white tape (Part No. 10-TAPE-1”), secure plug to the side of handpump.
Place handpump into corner of bailer bag and fold twice. Secure with a rubber band. (See Fig. 2B)
Connect both the bailer and the handpump to the raft lifeline using 24in. long x 1/16in. diameter nylon
cord (IPL Fig. 1, Item 140). Tie with bowline knots. Place in the center of the raft with nozzle facing
upward. (See Fig. 5)
Packing and Stowage of Sea Anchor
Fake Fold sea anchor line into 10in. folds and secure each with a small rubber band. Fold sea anchor
and wrap remaining line around it twice to secure. (See Fig. 2C)
Secure sea anchor to the raft with a bowline knot and place in the center of the raft. (See Fig. 5)
Packing and Stowage of Inflation Lanyard
Fake fold the lanyard cord and insert into painterline sachet (IPL Fig. 1, Item 80) leaving 2ft. of
exposed cord at both ends. (See Fig. 2D)
Light
Install the light into the holder (IPL Fig. 2, Item 30) on the top of the buoyancy tube. Place the battery
pack into the holder (IPL Fig. 2, Item 40) on the bottom of the buoyancy tube.
Using a 28in. piece of 1/16in. diameter nylon cord (IPL Fig. 1, Item 140), loop battery plug through the
front and side hole of the rear ballast bag and pull to tighten. (See Fig. 2E)
Knife
Tie one end of 48in. long x 1/16in. diameter nylon cord (IPL Fig. 1 Items 130) to the handle of the
knife. Tie the other end to the knife pocket on the buoyancy tube. Wrap cord around knife handle
then insert knife into pocket (IPL Fig. 2, Item 10). (See Fig. 5)
Summary of Contents for 45-AC2V
Page 1: ......
Page 2: ......
Page 4: ...Feb 25 11 RR 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 6: ...Feb 25 11 SB 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 12: ......
Page 17: ...LIST OF ASSOCIATED PUBLICATIONS Feb 25 11 9105 AP 1 AP None Listed...
Page 18: ...Feb 25 11 AP 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 20: ...Feb 25 11 AB 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 22: ...Feb 25 11 TC 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 24: ...Feb 25 11 1 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 28: ...Feb 25 11 2 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 34: ...FIGURE 2 VALISE Feb 25 11 2 8 9105...
Page 35: ...FIGURE 3 GAS INFLATION SYSTEM Feb 25 11 9105 2 9...
Page 38: ...FIGURE 4 RAFT DIMENSIONS Feb 25 11 2 12 9105...
Page 40: ...FIGURE 5 DEPLOYMENT Feb 25 11 2 14 9105...
Page 41: ...FIGURE 6 CANOPY ATTACHMENT Feb 25 11 9105 2 15...
Page 42: ...Feb 25 11 2 16 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 43: ...DISASSEMBLY Feb 25 11 9105 3 1 3 General 3 Procedures 5...
Page 44: ...Feb 25 11 3 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 46: ...Feb 25 11 3 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 49: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Feb 25 11 9105 3 7...
Page 50: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Feb 25 11 3 8 9105...
Page 52: ...Feb 25 11 4 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 54: ...Feb 25 11 4 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 56: ...Feb 25 11 4 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 58: ...Feb 25 11 4 8 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 63: ...FIGURE 1 DIGITAL MANOMETER Feb 25 11 9105 4 13...
Page 69: ...CLEANING Feb 25 11 9105 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Page 70: ...Feb 25 11 5 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 72: ...Feb 25 11 5 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 74: ...Feb 25 11 5 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 76: ...Feb 25 11 6 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 78: ...Feb 25 11 6 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 80: ...Feb 25 11 6 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 82: ...Feb 25 11 6 8 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 84: ...Feb 25 11 7 2 9105 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 86: ...Feb 25 11 7 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 93: ...FIGURE 1 PATCHES AND TAPE APPLICATION Feb 25 11 9105 7 11...
Page 94: ...FIGURE 2 PATCH APPLICATION OVER SEAM Feb 25 11 7 12 9105...
Page 96: ...Feb 25 11 7 14 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 98: ...Feb 25 11 8 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 100: ...Feb 25 11 8 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 103: ...Feb 25 11 9105 8 7 FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION...
Page 104: ...FIGURE 2E PREPARING LIGHT Feb 25 11 8 8 9105 FIGURE 2F INFLATION VALVE CYLINDER PREPARATION...
Page 119: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE Feb 25 11 9105 8 23 FIGURE 4 ATTACHING THE CYLINDER...
Page 120: ...FIGURE 5 STORAGE OF COMPONENTS Feb 25 11 8 24 9105...
Page 122: ...FIGURE 6B AC2V FOLDING DIAGRAM STEP 2 Feb 25 11 8 26 9105...
Page 123: ...FIGURE 6C AC2V FOLDING DIAGRAM STEP 3 Feb 25 11 9105 8 27...
Page 126: ...FIGURE 6H AC2V FOLDING DIAGRAM CC4 STEP 8 Feb 25 11 8 30 9105...
Page 127: ...FIGURE 7A AC4V FOLDING DIAGRAM STEP 1 Feb 25 11 9105 8 31...
Page 128: ...FIGURE 7B AC4V FOLDING DIAGRAM STEP 2 Feb 25 11 8 32 9105...
Page 129: ...FIGURE 7C AC4V FOLDING DIAGRAM STEP 3 Feb 25 11 9105 8 33...
Page 130: ...FIGURE 7D AC4V FOLDING DIAGRAM STEP 4 Feb 25 11 8 34 9105...
Page 131: ...FIGURE 7E AC4V FOLDING DIAGRAM STEP 5 Feb 25 11 9105 8 35...
Page 132: ...FIGURE 7F AC4V FOLDING DIAGRAM STEP 6 Feb 25 11 8 36 9105...
Page 133: ...FIGURE 7G AC4V FOLDING DIAGRAM STEP 7 Feb 25 11 9105 8 37...
Page 136: ...FIGURE 7L CC6 FOLDING DIAGRAM STEP 12 Feb 25 11 8 40 9105...
Page 137: ...FIGURE 8 PAINTERLINE LOOPS Feb 25 11 9105 8 41 FIGURE 9 ATTACHMENT OF CYLINDER NECK LOOP...
Page 138: ...FIGURE 10 ATTACHMENT OF CABLE LOOP Feb 25 11 8 42 9105...
Page 140: ...Feb 25 11 8 44 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 143: ...Feb 25 11 9105 8 47 Standard Kit Pack...
Page 144: ...Feb 25 11 8 48 9105 Standard Plus Kit Pack...
Page 145: ...Feb 25 11 9105 8 49 Deluxe Kit Pack...
Page 146: ...Feb 25 11 8 50 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 147: ...STORAGE Feb 25 11 9105 9 1 9 General 3 s...
Page 148: ...Feb 25 11 9 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 150: ...Feb 25 11 9 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 151: ...TOOL EQUIPMENT AND MATERIALS Feb 25 11 9105 10 1 10 General 3 Breakdown 5...
Page 152: ...Feb 25 11 10 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 154: ...Feb 25 11 10 4 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 160: ...Feb 25 11 11 2 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 164: ...Feb 25 11 11 6 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 168: ...Feb 25 11 11 10 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 170: ...FIGURE 1 LIFE RAFT ASSEMBLY Feb 25 11 11 12 9105...
Page 173: ...Feb 25 11 9105 11 15 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 174: ...FIGURE 2 HULL ASSEMBLY Feb 25 11 11 16 9105...
Page 176: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Feb 25 11 11 18 9105...
Page 178: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Feb 25 11 11 20 9105...
Page 180: ...Feb 25 11 11 22 9105 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 186: ...Feb 25 11 9105 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 188: ......