Electrical Installation
94 Operating instructions RLD
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
9.
The „ON“ or „RESET“ signal may be initiated via terminals 11 and 12:
Terminals 11 and 12: Positive pulse (12-24 V DC); practicable e.g. via PLC
(terminal 11 +, terminal 12 -).
10.
Fan supply: The power feedback modules of a higher power stage require the in the or-
dering code specified auxiliary voltage (230V or 115V).