Transport, scope of delivery, installation
17
Fig. 5: Attaching the hoist
3.10 Installation of the machine
Fig. 6: Locking the transport rollers
•
Place the device on a firm surface.
Please refer to the “Technical Data” chapter for further parameters.
The device must be locked before it is put into operation.
•
Press the locking lever (
FH
) of the two front rollers down.
3.11 Installation of the machine
Installation height: maximum 2000 m above sea level
FH
31.5 inches
31.5 inches
Summary of Contents for PM400
Page 3: ...3 ...
Page 23: ...Operating the machine 23 Fig 9 View of the back of the device S T U V W X Y ...
Page 58: ......
Page 59: ......